Laserfiche WebLink
RESOLUTION 7796 <br /> CITY OF MOUNDS VIEW <br /> COUNTY OF RAMSEY <br /> STATE OF MINNESOTA <br /> APPROVING A CONSTRUCTION CONTRACT WITH MUSKA ELECTRIC COMPANY <br /> FOR THE 2011 ELECTRICAL MODIFICATIONS FOR WELL NO. 2 MOTOR <br /> CONVERSION PROJECT <br /> WHEREAS, the motor for Municipal Well No. 2 is being converted from a <br /> dilapidated natural gas engine to a new variable speed electric motor; and <br /> WHEREAS, the pump was lowered and a new 200 HP electric motor was <br /> installed in 2010 for Well No. 2 as part of a well rehabilitation project, requiring electrical <br /> equipment and modifications to the well house to make the motor operable; and <br /> WHEREAS, engineering design was performed by Bolton Menk, Inc. and a <br /> quote solicitation package was developed and sent to five qualified electrical <br /> contractors.; and <br /> WHEREAS, three quotes were received and ranged from $55,400 to $72,450 <br /> with the low quote submitted by Muska Electric Company of Roseville, Minnesota; and <br /> WHEREAS, monies have been budgeted for 2011 under the Water Enterprise <br /> Fund (700- 4823 -7050) for the Project. <br /> NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of <br /> Mounds View, Ramsey County, Minnesota as follows: <br /> 1. The quote for $55,400 submitted by Muska Electric Company for construction of the <br /> 2011 Electrical Modifications for Well No. 2 Motor Conversion Project is hereby <br /> accepted by the City. A 5% contingency of $2,800 is approved to cover potential <br /> additional construction costs and requires approval by the Public Works Director. <br /> 2. The Public Works Director is directed to prepare a construction contract with Muska <br /> Electric Company for said work at said price. <br /> 3. Upon satisfactory review by the City Attorney, the Mayor and City Administrator are <br /> hereby authorized and directed, for and on behalf of the City, to execute and enter <br /> into the construction contract with Muska Electric Company. <br /> 4. Bolton Menk, Inc. is authorized to provide engineering services for the <br /> construction phase of the said project on an hourly basis not to exceed $5,000. <br /> 5. Bolton Menk's design fee associated with the project is increased $3,500 for a <br /> revised lump sum compensation of $23,500. <br /> 6. Costs associated with supplying a new main electrical service to the project site by <br /> Xcel Energy is approved. <br />