Laserfiche WebLink
_ --"- �� F I z `_ - - <br />a -- - ------ ---- _- `- - -- -_- --- -- ----- =---, ,_.,_�_.>. --_- -. , . . .. <br />> � <br />_ �, .� .. . <br />- - <br />_ . �: s � . . , <br />Planning Commission Report <br />Bridges Technology Park Phase II <br />Planning Case 514-98 <br />March 27, 1998 <br />Page 2 <br />Discussion: <br />Damensional Requirements: <br />Lot Area: <br />Building Height: <br />Building Elevation: <br />Building Setbacks <br />� Front (Coral Sea St.) <br />• Side <br />• Rear: <br />Parking Lot Setbacics <br />° Front (Coral Sea St.): <br />• Side: <br />Re uir d <br />1 acre <br />S 45 feet <br />>_ 901.6 feet <br />40 feet <br />20 feet <br />40 feet <br />40 feet <br />5 feet <br />Provided <br />2.59 acres <br />18 feet <br />908.5 feet <br />40 feet <br />70 feet <br />160+ feet <br />40 feet <br />5 feet <br />Drainage, Wetland Consider•ations and Wetland Alteration Permit• <br />Met? <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br />This lot was platted as part of the Northstar Industrial Park 2nd Addition. At the time of platting, <br />a comprehensive drainage plan was prepared which identified the ponding requirements for Lots <br />1, 2 and 3. The major wetland along the western boundary of these lots was also delineated at <br />that time. The applicant is proposing a drainage system which coordinates with the earlier plan. <br />There will be a storm drain at the rear of the building to capture the building a parking lot runoff, <br />directing it to the existing stormwater retention/detention pond behind the existing building. The <br />runoff in the front of the building will drain into a catch basin which is then directed to the City of <br />Blaine's storm sewer under Coral Sea Street. <br />Because work is being done within 100 feet of the wetland, the applicant will need to have a <br />wetland buffer permit approved by the City. From the site plans, the new parking area will be <br />eight feet from the delineated edge of the wetland, but will not encroach into the wetland. The <br />existing building and parking lot come within 13 feet of the wetland, but no closer. The applicant <br />will have prepared a revision to the site plan prior to the meeting of thee Planning Commission <br />which shows where the 100-foot wetland buffer is, indicating the amount of impervious surface <br />within the buffer. Rice Creel< Watershed District has reviewed the applicant's drainage plans and <br />has approved them pendin� payment of a cash surety and dedication of an easement area over the <br />existing wetlands on site. <br />Parkin�' <br />The parking ratios as required in the City Code fbr office and warehouse uses are as follows: <br />Office: 3 spaces plus 1 per 175 square feet of floor area <br />Warehouse: 8 spaces plus 1 per 500 square feet of floor area <br />