Laserfiche WebLink
t-'__ ... _u_ ., . :-= � —=• - =` <br />- - __— _ __ �; I� `_.'��c�..� :��I ��-r`- --- _ - " - <br />3. The site area has increased from 23.99 acres to 26.03 acres. <br />4. Impervious site area has decreased from 36.9 % of the site area to 35.7 %. Pervious <br />area has increased from 63.1 % of the site area to 64.3 %. <br />5. The northernmost and southeznmost driveways on Highway 10 remain on the plan. <br />6. Sidewallcs are shown along Highway 10 and along the northern edge of the wetland. <br />7. Trash encloswres aze shown for each of the buildings. <br />8. The two NURP stormwater ponds have been replaced with one large pond. This is due <br />to the fact that city stormwater from north and east of the site will be piped to the new <br />pond to help alleviate e�cisting stormwater problems in the area. <br />9. Snow storage areas are shown on the plan. <br />10. No access is shown to Long Lake Road as was encouraged as part of the general <br />concept plan approval. <br />11. Deceleration lanes are shown on the plan. <br />A detailed staff review of the plans and of the changes will be provided to the Planning <br />Commission once all the comments have been received from the other agencies. <br />Recommendation: <br />As previously mentioned no action is required. Staff and the applicant will be present to discuss <br />the project with the Plaruung Commission. Any questions and/or additional information needed <br />should be identified. <br />N:�DATA\GROUPS\COMDEV�DEVCASESk171-9�1517-98. PC 1 <br />4 <br />