My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998 Planning Commission Packets
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
1990-1999
>
1998
>
1998 Planning Commission Packets
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2018 10:25:19 AM
Creation date
2/22/2012 8:14:59 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
882
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a. Excavation: The driveway or parking area shall be excavated to remove all black dirt <br />from the area to be surfaced. <br />b. Drainage Provisions: The driveway or parking area shall be constructed so as to <br />provide drainage from the garage to the street unless a variance is granted by the Building <br />Inspector'. <br />Subd. 2. Gravel Construction: After initial excavation, the driveway parking area construction <br />shall consist of a minimum of four inches (4 ") of Class 2 crushed rock (314" down) <br />compacted in place. <br />Subd. 3. Concrete Construction: <br />a. After initial excavation, the driveway shall be backfilled with Class 4 base material, <br />compacted in place, to an elevation four inches (4 ") below the finished surface grade of <br />the driveway. <br />b. The driveway construction shall consist of a minimum of four inches (4 ") of three <br />thousand five hundred (3,500) pound mix, four inch (4 ") slump with air. <br />Subd. 4. Asphalt Construction: <br />a. After initial excavation, the driveway shall be backfilled with Class 4 base material, <br />compacted in place, to an elevation four inches (4 ") below the finished surface grade of <br />the driveway. <br />b. The driveway construction shall consist of a minimum of two inches (2 ") (compacted <br />thickness), Class 5 base material and a minimum of two inches (2 ") (compacted thickness) <br />bituminous wearing course conforming to Minnesota Highway Department specifications <br />2331. <br />c. The bituminous wearing course material shall not be delivered to the job site until the <br />Class 5 base material has been placed compacted. (1988 Code §44.05) <br />Subd. 5. Brick Construction: <br />a. After initial excavation. the driveway shall be bac filled with Class 4 base material, <br />compacted in place. to an elevation four inches (4'2 below the finished surface grade of <br />the driveway. <br />b. The driveway construction shall consist of a minimum of one inch (1) compacted <br />thickness sand base upon which the bricks or pavers are to he fitted in place. (Ord. <br />Xxx 12 -12 -982 <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.