Laserfiche WebLink
SYSCO Foods Expansion <br />Planning Case 532 -98 <br />August 19, 1998 <br />Page 2 <br />Discussion: <br />Drainage and Soil Suitability <br />At the time this report was written, staff had not yet received a copy of the drainage plan prepared <br />for the Sysco site. It is our understanding, however, that when the development was constructed <br />in 1988, the ponding was sized to accommodate the maximum planned buildout. I verified that <br />this was the case with SEH and also with Rice Creek Watershed District, who indicated that <br />because of revised standards and other drainage requirements, a new watershed district permit <br />would need to be obtained. Staff has not yet received a copy of the drainage plan, although we <br />have received a copy of the drainage calculations, which were sent to the City Engineer for <br />review. With regard to soil suitability, it is staffs understanding that the soils are reasonably <br />suited for the planned expansion, however the applicant will be providing information to the City <br />to supporty this. <br />Setbacks: <br />The plans provided to staff, date stamped 8/14/98, do not explicitly show setbacks and thus have <br />been estimated by staff. Because of this, we have requested a confirmation of all setback <br />distances from the applicant and will report to the Planning Commission if they are different from <br />our estimates. The current conditions plan show the front setback for the Sysco facility to be 30 <br />feet, while the setback for parking lot appears to be zero feet. It is proposed that the parking lot <br />expansion will maintain the same zero setback. The existing setback for the access drive along the <br />east side of the property begins at 50 feet, then narrows to a zero setback, gradually increasing to <br />25 feet before ending at approximately 18 feet. The proposal shows the access drive extending <br />the zero setback for approximately 300 feet. The truck parking at the rear of the property <br />currently ranges from 15 to 20 feet, which is shown to be decreased by 10 feet. The new truck <br />parking along the western edge is shown with a 10 foot setback. <br />Staff is concerned about the reduced and zero setbacks present in the proposed expansion plans. <br />The City may, however, allow these setbacks in conjunction with the development plan because of <br />Sysco's PUD zoning status, which allows for deviations from the City's setback requirements. It <br />appears from the plans that the zero setback status is a present condition which, by virtue of its <br />existence, has received City approval in the past. The reduced setback toward the rear of the <br />property are less of a concern, as this area borders Highway 118 and is shielded from view by the <br />noise barricades. The reduced setback along the eastern edge of the property is of a concern not <br />because of the adjacent property owner, but rather because of the possible environmental impact <br />to the wetlands. To protect against possible degradation of the wetlands, staff would recommend <br />that the access drive maintain a minimum ten foot setback along the property's entire eastern <br />edge, This would result in the drive aisle being narrowed to forty feet in one area unless it could <br />be shifted to the west a compensating distance. <br />