Laserfiche WebLink
MIPH <br />February 21, 2001 <br />Fage 3 <br />wouid be completely encased within a one-piece aiuminunr� housing. The provided foot-candle <br />readings a.re all within the Code requirements. <br />Access: <br />Access to this parcel can be achieved from the east-bound lane of Highway 10 or fram Silver <br />Lake Road. The Highway 10 access is a right-in right-out access only and does not provide for <br />access from ihe west-bound lanes. The access from Silver Lake Road is shared with the Holiday <br />store and documents are on file which grants permanenily access to Holiday, This was a <br />condition of the �ilverview estates PUD. The driveway and access drive widths, turning radii and <br />parking lot aisle widths have been reviewed by the Fire Marshal who found the plans consistent <br />with fire department requirements. <br />,f�CCeSS01y ,�tYUCtuYes: <br />The plans indicate a trash enclosure on the lot behind the buildi�g. The PUD aliows for a trash <br />enclosura but no other accessory buildings. The enclosure shall be constructed of a�nasonry <br />rnaterial to match the building and shall have locking ar latching gates which when closed do not <br />offer any visibility of the dumpsters or refuse within the enclosure. <br />Draina�e and Utilitv: <br />The applicar�t has consulted with Rice Creek Watershed District to determine if iheir review was <br />necessary. Because the siie area is iess than 2.5 acres, their review is n�t needed. The a�plicants <br />will however provide detailed stormwater runoff date to ensure that the previousiy constructed <br />pond is sufficiently sized to acco�odate the runoff. The Grading, Utility and Erosion Control <br />Pian (I'age C2.0} indicate four catch basins will be installed and the stormsewer wi11 connect to <br />the e�sting sewer than presently drains into the pond. The n�noff from the roof will drain into the <br />pond via a burxed 10-inch pipe. The proposed first floor elevation (FFE) is 912.3, which is four <br />feet above the City's recommended miniz�raurzi huilding elevation for this site. <br />Trailyvav and Lightzng.• <br />As has been the ca.se with previous Highvaay 10 development projects, the City requires provision <br />of a 9-faot wide bituminous trailway and decorative lights. Rather than requiring the developer to <br />install a trailway along the front of this property ihat connects with no other trailway, staff is <br />negotiating with the developer to install a trailway thai begins at the corner of Highway 10 and <br />Silver Lake IZoad and terminates ai the coz°ner of Highway 10 and Couniy Road T. In re�urn for <br />the complete trail installation, stai� suggested that the City might be willing to be responsible for <br />the installation of the decorative lights, which Iast year cost $5,000 each. �taff has contacted Mr. <br />George Winiecki, the property owner of the lot immediately southeast of the NLQ'H lot about a <br />possible easement dedication to aliow the trailway to cross his property. He seemed receptive to <br />the passibility. Staff wiIi contact the owners of the Fioliday store and seek their input regarding <br />tius issue and 1;he development as a whole. <br />