My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001 Planning Commission Packets
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
2000-2009
>
2001
>
2001 Planning Commission Packets
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2012 9:14:03 AM
Creation date
2/27/2012 4:13:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
932
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. ,.-.:-___ _ <br />Gity of Mounds View <br />Planning Commission Report <br />Meeting Date: October 17, 2001 <br />Item # 9 <br />Title: DISCUSSION REGARDING A REVISED SITE PLAN FOR THE OFFICE BUII,DING <br />UNDER CONSTRUCTI4N AT 7664 GREENFIELD AVENUE, REAPPROVAL <br />REQUESTED BY TONY MEZZENGA (PLANNING CASE DE00-002) <br />Inhoduction: <br />As was discussed at the last Planning Commission meeiing, a snag has developed concerning the <br />construction of the office building at 7664 Greenfield Avenue. Specifically, upon seeldng an access <br />pernut from Ramsey County, Mr. Mezzenga was told the driveway could not be located where the <br />plans indicated due to the presence of an LP4 Manhole Curb Box Inlet. That's county-speak for a <br />storm sewcr catch basin. At last communication with the County, we were told that the catch basin <br />cannot be moved or altered, so the driveway must move to either side, or to Greenfield Avenue. <br />Discussion: <br />�' ,} As a resul� of this new development, it is quite obvious that something has to be resolved as to the <br />` r. ' location of the driveway. There are three five di�erent options, three of which involve a relocation, <br />one which would iavolve the reconstruction of the storm sewer (which has not been completely <br />ruled out) or the last option, which would be to not approve a change in the location of the <br />driveway. I would caution the Planning Commission that wtule the last option is an option, it is not <br />an advisable option. �i • <br />O t_ ip on 1• Move the access driveway to the west, toward Tom Thumb. If this is the chosen option, <br />the access would take out two parking spots and would result in a very unconventional entrance <br />configuration. (Refer to the example.} A variant of this option would be to take access from Tom <br />Thumb, though this would not improve the geometrics of the entrance and would cause the <br />driveway to be located only three to four feet away from the County Road I right of way. <br />Ontion 2. Move the access to the east, toward Greenfield Avenue. The impact of this option <br />would result in the parking lot only 7 feet from Greenfield Avenue. Unfortunately, the variance <br />approved by the Planning Commission only allows for a I O-foot parking Iot setback. In addition, <br />the curb cut would only be 25 feet from the corner where a SO-foot setback is required. That would <br />mean another variance. <br />Oation 3. Reconstruct the catch basin. This is the best option as it would not involve <br />reconfiguring the access, the parlang lot or anything else. Having aiready spoken to the Ramsey <br />County Traffic Engineer, i can relate that tlus option will be highly unlikely, though one that will <br />necessitate additional consultation with the County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.