Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />, <br /> <br />. . <br /> <br />RESOLUTION NO. 2492 <br />PAGE FIVE <br /> <br />WHEREAS, it is recognized that the lowest floor elevation <br />will be at least two feet above the elevation of the adjacent <br />wetland boundary. <br /> <br />WHEREAS, Everest Development will construct a business <br />park, a roadway extension, a walking trail, a Type 4 wetland, and <br />two (2) storm water runoff detention basins~ and <br /> <br />WHEREAS, approximately two (2) acres of the business park <br />are located within the buffer zone of the 1-3 Wetland Zoning <br />District~ and <br /> <br />WHEREAS, construction activities associated with the <br />Business Park reportedly will impact 0.006 acres of the wetland~ <br />and <br /> <br />WHEREAS, the extension of Woodale Drive involves the <br />excavation of wetland soil and placement of fill into the 1-3 <br />wetland~ and <br /> <br />WHEREAS, approximately 0.1 acres of wetland and 2 to 3 <br />acres of upland buffer will be impacted by the extension to <br />Woodale Drive~ and <br /> <br />WHEREAS, the walking trail is located within the wetland <br />and construction of the trail will require placement of fill over <br />1.3 acres of wetland on the school property~ and <br /> <br />WHEREAS, the trail is constructed with the intent of <br />providing the citizens of Mounds View with a low impact access to <br />the 1-3 wetland for educational, aesthetic and recreational <br />purposes~ and <br /> <br />WHEREAS, construction of a Type 4 deep marsh wetland is <br />also associated with the Mounds View Business Park development. <br />The Type 4 Wetland will be located within the existing 1-3 <br />Wetland, and will replace approximately two (2) acres of existing <br />Type 2 wet meadow and Type 6 shrub swamp. The Type 4 wetland <br />will be constructed with the intent of increasing the diversity <br />of habitat within the 1-3 Wetland~ and <br /> <br />WHEREAS, two (2) storm water runoff detention basins will <br />be constructed as part of the development. The detention basins <br />are located on uplands and are designed to provide storm water <br />storage and water quality treatment. The discharge from the <br />largest detention basin is directed to the wetland the discharge <br />from the smaller detention basin is directed to Rice Creek~ and <br /> <br />WHEREAS, two (2) wetland alteration permits are required <br />as a result of the placement of structures within the wetland <br />buffer zone, placement of fill in the wetland, and excavation of <br />material from the wetland~ and <br />