My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 8013
MoundsView
>
Commissions
>
City Council
>
Resolutions
>
08000 - 08499 (2012-2016)
>
Resolution 8013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 10:09:02 AM
Creation date
11/19/2012 2:59:44 PM
Metadata
Fields
Template:
MV City Council
City Council Document Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONSTRUCTION SITE AND LAND DISTURBANCE FEES (Ord. 804/Chapter 1303) <br /> Land Disturbance Permit Fees:* <br /> 50 cubic yards or less $29--$25 <br /> 51 to 100 cubic yards $44 $50 <br /> 101 to 1000 cubic yards :.• - _ -- !El _ . _ _ e . <br /> $21.00 $50 base fee plus $20 for each <br /> additional 100 cubic yards or fraction <br /> thereof <br /> 1001 to 10,000 cubic yards $226 for the first 1000 cubic yards, plus <br /> $ 00 $250 base fee plus $25 additional <br /> for each 1000 cubic yards or fraction <br /> thereof <br /> 10,001 to 100,000 cubic yards $377 for the first 10,000 cubic yards, plus <br /> $7 -00 $500 base fee plus $100 for each <br /> additional 10,000 cubic yards or fraction <br /> thereof <br /> 100,001 cubic yards or more $1,064 for the first 100,000 cubic yards, <br /> plus $44.00 $1,500 base fee plus $250 for <br /> each additional 100,000 cubic yards or <br /> fraction thereof. <br /> *Additional fees may be required for legal and consulting engineering costs incurred by the <br /> City <br /> OTHER MISCELLANEOUS PUBLIC WORKS FEES (Actual time is rounded up to the nearest full hour) <br /> Overweight/Oversize Permit Fees $50 daily per vehicle (One-time trips) <br /> $150 weekly per vehicle (Regularly scheduled <br /> trips) <br /> Emergency Utility Locates No charge if during business hours, <br /> otherwise actual time at call-out rate <br /> Call-out Charge for Contractor Negligence Actual time at Call-out Rates <br /> (lack of maintenance, traffic signs, etc.) <br /> Water Tower Communications Fees: <br /> Water Tower Access Fee No charge if during normal business hours, <br /> otherwise 1 hour actual time at Call-out <br /> Rate per visit <br /> Plan Review and Inspection Fees Actual City, legal, and consulting <br /> engineering costs ($2,000 minimum) <br /> 2012 Fee Schedule Page 20 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.