My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 8013
MoundsView
>
Commissions
>
City Council
>
Resolutions
>
08000 - 08499 (2012-2016)
>
Resolution 8013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 10:09:02 AM
Creation date
11/19/2012 2:59:44 PM
Metadata
Fields
Template:
MV City Council
City Council Document Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Basement <br /> Unfinished, New Construction $16.44 per sq. ft. <br /> Rough In Finish $21. 0 per sq. ft. <br /> Finished, New Construction $27.81 per sq. ft. <br /> Crawl Space $8.53 per sq. ft. <br /> Basement Finish/Remodel Existin• $11.15 per sq. ft <br /> General Remodel $22.33per sq. ft. <br /> Deck <br /> Residential $9.92 per sq. ft. <br /> Porch <br /> Open/Screen only $29.17 $25.17 per sq. ft. <br /> Three-Season (wood frame/windows/doors $52.83 per sq. ft. <br /> Not Heated) <br /> $22.00 per sq ft. <br /> Swimming Pools (See Chapter 1009) <br /> Above ground--Permanent (over 52" 24" in $40.64 $8.00 per sq. ft. <br /> depth and over 5,000 gallons) <br /> Below ground $31.82 per sq. ft. <br /> Above ground — Temporary (over 24" in $30 (zoning permit) <br /> depth and under 5,000 gallons) <br /> B. SURCHARGES <br /> Building Surcharge: Where the fee for the permit is based upon valuation, the surcharge is as <br /> follows: <br /> Building Surcharge <br /> (For valuation-based permits, the surcharge is as follows) <br /> Valuation of Work 1 Surcharge Computation <br /> $1,000,000 or less .0005 x valuation <br /> $1,000,000 to $2,000,000 $500 + .0004 x (Value - $1,000,000) <br /> $2,000,000 to $3,000,000 $900 + .0003 x (Value - $2,000,000) <br /> $3,000,000 to $4,000,000 $1,200 + .0002 x (Value - $3,000,000) <br /> $4,000,000 to $5,000,000 $1,400 + .0001 x (Value - $4,000,000) <br /> Greater than $5,000,000 $1,500 + .00005 x (Value - $5,000,000) <br /> For fixed-fee permits, the surcharge shall be $5.00 per permit (or .0005 of the permit fee if <br /> permit fee exceeds $10,000). <br /> Heating & Plumbing Surcharge <br /> Residential $5.00 per permit (or .0005 of the permit <br /> fee if fee exceeds $10,010). <br /> Commercial Use the above table <br /> C. GENERAL CONSTRUCTION, HOME, MISCELLANEOUS BUILDING PERMITS. <br /> (Surcharges not included in all figures listed below -- See Surcharge Section in Chapter 1006 for <br /> more information) <br /> Accessory Buildings Use valuation table <br /> Additions or Remodels Use valuation table <br /> 2012 Fee Schedule Page 4 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.