Laserfiche WebLink
Signs 100 sq. ft. and over $75 for the first 100 square feet plus $10 for <br /> each additional 100 square feet or fraction <br /> thereof <br /> Signs re-facing or altering $40 per installation <br /> Temporary Signs $40 per 21 day period (Limit 4 permits per <br /> year plus one additional permit for a banner <br /> Billboards/Billboard Alterations $250 per billboard (plus $5.00 surcharge) <br /> Sprinkler Systems (Fire Suppression) <br /> Sprinkler; Residential Use Valuation Table <br /> (City fees waived for systems installed <br /> voluntarily) <br /> Sprinkler; Commercial 1.5% of the contract price Use valuation table <br /> plus surcharge at .0005 times the contract <br /> price <br /> Sprinkler Plan Check Fee 65% of permit fee (for new construction or <br /> 20 heads or more only) <br /> Residential Swimming Pools <br /> Permanent (above or below ground) Use Valuation Table <br /> Temporary (52" high or less) $25 (plus $5.00 surcharge) <br /> Telecommunication Antenna $750 plus $5.00 surcharge per system <br /> (Building Permit Fee, see also Chapter 1124) installation. For installations on city <br /> property, fee is 7% of yearly rent to city (plus <br /> $5.00 surcharge) <br /> $50 each for swapping antennas <br /> .. <br /> Use valuation table plus <br /> surcharge at .0005 times the contract price. <br /> For installations on city property, fee is 7% of <br /> yearly rent to city (plus $5.00 surcharge) <br /> Warehouse Racking Systems (commercial) Use Valuation Table <br /> Windows See Door/Window Installation <br /> D. OTHER INSPECTIONS / PLANNING FEES <br /> Applicants are responsible for all costs incurred associated with the filing, review and <br /> processing of development applications. Such fees are to be paid in escrow up front or upon <br /> receipt of statement from the City of Mounds View. Fees may include but are not limited to <br /> costs for consultants retained by the City, consultant planning services, attorney, and engineer <br /> fees. A deposit may also be required to cover costs of public notices, materials and staff time <br /> spent in the review, research or preparation of materials associated with this application. The <br /> applicant shall be responsible for all reasonable incurred costs in excess of the initial fee <br /> and/or deposit amount. Any portion of the deposit not spent or encumbered shall be refunded <br /> to the applicant within 30 days after consideration of the application is completed. Payment of <br /> park dedication fees is required with subdivision applications. Application fees are not <br /> refundable. <br /> 2012 Fee Schedule Page 7 of 20 <br />