Laserfiche WebLink
<br /> 17. Plumbing Work (plus surcharge) <br />. A. plumbing fixture, devices, connections - $15.00 plus <br /> $7.00 per fixture, device and connection <br /> 18. Refrigeration Work (plus surcharge) <br /> A. equipment under 100,000 BTU per hour capacity <br /> (12,000 BTU per ton) - $15.00 plus $2.00 per 10,000 <br /> BTU per hour or fraction thereof over 10,000 BTU per <br /> hour capacity <br /> B. equipment over 100,000 BTU per hour capacity (12,000 <br /> per ton) - $35.00 plus $2.00 per 100,000 BTU per hour <br /> or fraction thereof over 100,000 BTU per hour capacity <br /> 19. Signs, Billboards (no surcharge) <br /> A. signs up to 100 square feet - $50.00 $35.00 for the first <br /> 24 square feet plus $5.00 for each additional 25 square <br /> feet or fraction thereof of to 100 square feet <br />. B. signs 100 square feet and over - $75.00 $65.00 for the <br /> first 100 square feet plus $10.00 for each additional 100 <br /> square feet or fraction thereof <br /> C. signs: refacing or altering - $20.00 per installation <br /> 20. Heating and Ventilation Work (plus surcharge) <br /> A. gas, oil burner equipment - $25.00 plus $5.00 per <br /> 100,000 BTU per hour or fraction thereof over 100,000 <br /> BTU per hour input (commercial, rooftop units) <br /> B. gravity warm air heating - $35.00 per installation repair, <br /> alteration or extension <br /> C. mechanical warm air heating - $25.00 plus $5.00 per <br /> 100,000 BTU per hour or fraction thereof over 200,000 <br /> BTU per hour input capacity <br />. D. duct or tin work - Use Valuation Table <br />