Laserfiche WebLink
<br />. <br /> <br />10. Playground replacement at Hillview Park. C - 2008 ($32,000 -includes <br />$6,000 for fiberfill) <br /> <br />11. Park Building at Lambert Park - replace existing building. CIP 2010 <br />design / 2011 construction C - 2010 ($250,000 $20,000 in 2010 for <br />Designl $230,000 in 2011 for Construction) <br /> <br />12. Elevation on ballfield and repair drainage ditch at Lambert Park. Park <br />Foreman Recommendation. C - 2007 ($25,000) <br /> <br />13. Pave the pathway on the northwest corner of Hillview and Quincy at <br />Oakwood Park. Suggested during May 8, 2003 park tour. C - 2007 <br /> <br />14. Determine the feasibility of developing a small soccer field at the <br />northwest corner of Hillview and Quincy at Oakwood Park. Suggested <br />during May 8. 2003 park tour. C - 2006 ($20,000+$4,000) <br /> <br />15. Park Building at Random Park - replace existing building. CIP 2010 <br />design /2011 construction C - 2012 ($250,000 - $20,000 in 2012 for <br />Designl $230,000 in 2013 for Construction) <br /> <br />16. Random Parking Lot - reconstruct the parking lot. C - 2008 ($30,000) <br /> <br />. <br /> <br />17. Resurface parking lot at Silver View Park. C - 2008 ($50,000) <br /> <br />18. Paved trail at Woodcrest Park. C - 2007 <br /> <br />. <br />