My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 883
MoundsView
>
Commissions
>
City Council
>
Ordinances
>
2010-2019
>
2013
>
Ordinance 883
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 2:22:58 PM
Creation date
9/10/2013 3:13:20 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Ordinances
MEETINGDATE
9/9/2013
Commission Doc Number (Ord & Res)
883
Supplemental fields
City Council Document Type
Ordinances
Date
9/9/2013
Resolution/Ordinance Number
883
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ordinance 883 <br /> Page 11 <br /> i. Utility Company Interconnection. Prior to the installation or erection of a <br /> WECS, the operator must provide evidence showing their regular electrical <br /> service provider has been informed of the customer's intent to install an <br /> interconnected, customer-owned generator. Off-grid systems shall be exempt <br /> from this requirement. All connections shall be underground. <br /> j. Compliance with State Building Code. A standard drawing of the structural <br /> components of the wind energy conversion system and support structures, <br /> including base and footings shall be provided along with engineering date and <br /> calculations to demonstrate compliance with the structural design provisions <br /> of the State Building Code. Drawings and engineering calculations shall be <br /> certified by a registered engineer. <br /> k. Compliance with National Electrical Code. WECS electrical equipment and <br /> connection shall be designed and installed in adherence to the National <br /> Electrical Code. <br /> I. Inspection. The City hereby reserves the right upon issuing any WECS <br /> conditional use permit to inspect the premises on which the WECS is located. <br /> If a WECS is not maintained in operational conditions and poses a potential <br /> safety hazard, the owner shall take expeditious action to correct the situation. <br /> Subd. 5. Submittal Requirements. <br /> a. Site Plan Drawing. All applications for a WECS Conditional Use Permit shall <br /> be accompanied by a detailed certified survey/site plan drawn to scale and <br /> dimensioned, displaying the following information: <br /> 1. Lot lines and dimensions. <br /> 2. Location and height of all buildings, structures, aboveground utilities <br /> and trees on the lot, including both existing and proposed structures <br /> n anchors. <br /> d guy wire a chors. <br /> 3. Location and height of all adjacent buildings, structures and <br /> aboveground utilities and trees located within three hundred fifty (350) <br /> feet of the exterior boundaries of the property in question. <br /> 4. An elevation drawing of the premises accurately depicting the <br /> proposed WECS and its relationship to structures on the subject site <br /> and adjacent lots. <br />
The URL can be used to link to this page
Your browser does not support the video tag.