My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 8172
MoundsView
>
Commissions
>
City Council
>
Resolutions
>
08000 - 08499 (2012-2016)
>
Resolution 8172
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 10:09:03 AM
Creation date
11/26/2013 9:47:42 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VI. PUBLIC WORKS RELATED FEES <br /> CALL-OUT RATE SCHEDULE (used for all hourly-based fees in this chapter) <br /> Normal Business Hours for Call-out Rates 7:00 a.m. to .30-0 3:30 p.m., Monday thru <br /> Friday <br /> Standard Call-out Rate: Specified time $50 per hour specified <br /> conducted entirely within normal business <br /> hours <br /> After-Hours Call-out Rate: Specified time $100 per hour specified <br /> conducted outside normal business hours <br /> Holiday Call-out Rate: Specified time $150 per hour specified <br /> conducted on holidays <br /> RIGHT-OF-WAY MANAGEMENT FEES (Chapter 910) <br /> Registration Fee (Annual) $30 <br /> Excavation Permit Fees:* <br /> Hole Fee $135$150 per hole excavated <br /> Trench Fees (requires Hole Fee) $60 $70per 100 lineal feet of trenching <br /> beyond hole <br /> Trenchless Fees (req. Hole Fee) $30 $35per 100 lineal feet of utility installed <br /> using trenchless methods (HDD, etc.) <br /> Obstruction Permit Fees:* <br /> Obstruction Base Fee $60 $70 per obstruction <br /> Lineal Obstruction Fee $10 per 100 lineal feet obstructed (in-line w/ <br /> (requires Obstruction Base Fee) traffic) per each week of obstruction <br /> Permit Extension Fee $2-5$30 <br /> Delay Penalty $15 per day <br /> Restoration Cost Security: Determined on a <br /> permit-by-permit basis by the PW Director Minimum security amounts: <br /> Hole Excavation (per hole) Paved Areas: $500$5,000 <br /> Turf Areas: $250 <br /> Trench Excavation (per 100 feet) Paved Areas: $2,500$5,000 <br /> Turf Areas: $500 <br /> Trenchless Excavation (per 100 feet) Paved Areas: $500 <br /> Turf Areas: $100 <br /> *Additional fees may be required for legal and consulting engineering costs incurred by the <br /> City <br /> 2014 Fee Schedule Page 19 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.