Laserfiche WebLink
CONSTRUCTION SITE AND LAND DISTURBANCE FEES (Ord. 804/Chapter 1303) <br /> Land Disturbance Permit Fees:* <br /> 50 cubic yards or less $25 <br /> 51 to 100 cubic yards $50 <br /> 101 to 1000 cubic yards $50 base fee plus $20 for each 100 cubic <br /> yards or fraction thereof <br /> 1001 to 10,000 cubic yards $250 base fee plus $25 for each 1000 cubic <br /> yards or fraction thereof <br /> 10,001 to 100,000 cubic yards $500 base fee plus $100 for each 10,000 <br /> cubic yards or fraction thereof <br /> 100,001 cubic yards or more $1,500 base fee plus $250 for each <br /> 100,000 cubic yards or fraction thereof. <br /> *Additional fees may be required for legal and consulting engineering costs incurred by the <br /> City <br /> OTHER MISCELLANEOUS PUBLIC WORKS FEES (Actual time is rounded up to the nearest full hour) <br /> Overweight/Oversize Permit Fees $50 daily per vehicle (One time trips) <br /> $150 weekly per vehicle (Regularly scheduled <br /> trips) $25 per load <br /> Emergency Utility Locates No charge if during business hours, <br /> otherwise actual time at call-out rate <br /> Call-out Charge for Contractor Negligence Actual time at Call-out Rates <br /> (lack of maintenance, traffic signs, etc.) <br /> Water Tower Communications Fees: <br /> Water Tower Access Fee No charge if during normal business hours, <br /> otherwise actual time at Call-out Rate per <br /> visit <br /> Plan Review and Inspection Fees Actual City, legal, and consulting <br /> engineering costs ($2,000 minimum) <br /> 2014 Fee Schedule Page 22 of 22 <br />