Laserfiche WebLink
Demolition and Wrecking $30 plus $3.00 per 1,000 cubic feet or <br /> fraction thereof over 2,000 cubic feet plus <br /> $5.00 surcharge <br /> Residential Door or Window Installation <br /> Change Opening/Egress $40 for first windows/door plus $12.50 for <br /> each additional window/door (plus $5.00 <br /> surcharge) <br /> Use Existing Rough opening $30 for first window/door plus $5.00 for each <br /> additional window/door (plus $5.00 <br /> surcharge) <br /> Driveways, Sidewalks, Parking Lots, Patios; New Installation or Overlay (No Surcharge) <br /> * A Right-of-way permit is also required for any construction that disrupts City-owned streets, <br /> curbing, sidewalks, etc. <br /> Residential Concrete/Asphalt/Brick: $30 for first 500 <br /> (R-1 or R-2 Overlay or Seal Coating with no square feet plus $2 for each additional 100 <br /> expansion, no permit needed.) square feet or fraction thereof (no surcharge) <br /> Gravel*: $20 (no surcharge) <br /> * See zoning code for gravel limitations. <br /> R-4 or R-4 Overlay $25 for first 500 square feet plus $2 for each <br /> additional 500 square feet. <br /> Commercial Use Valuation Table <br /> Electrical Work -- Same as established by the Minnesota State Board of Electricity. <br /> Elevators Use valuation table <br /> Fences/Kennels <br /> Six feet and below $30 per installation (no surcharge) <br /> Above six feet $40 per installation (plus $5.00 surcharge) <br /> Fire Permits <br /> Fire Alarm Systems/Panels $100 <br /> Fire Works Display $100 <br /> Fireworks Sales $350 (business selling only fireworks) <br /> $100 (business selling fireworks & other <br /> retail) <br /> Temporary Tent $50 <br /> Tank Installation (fuel, oil, gas, etc.) $100 per tank (no surcharge) <br /> Tank Removal (fuel, oil, gas, etc.) $50 per tank (no surcharge) <br /> Operational Permits $50 $25 (annually) <br /> Fireplaces <br /> Wood/Corn burning Stove (Building Permit) $30 plus $5.00 surcharge <br /> Gas Fireplace See Mechanical <br /> Insulation $30 plus $5.00 surcharge <br /> Manufactured Homes (See Chapter 1110) <br /> Installation Work Use valuation table <br /> Mechanical (Gas hook up) $25 (plus $5.00 surcharge) <br /> 2014 Fee Schedule Page 5 of 22 <br />