Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />D. <br /> <br />Water Permit Surcharge - $.50 <br /> <br />E. Sewer Permit Surcharge - $.50 <br /> <br />91. Plan Check Pee - when a plan is required to be submitted by Subsection (C) of Section <br />301 of the Uniform Building Code. except for residential garages, storage buildings. <br />decks and additions costing less than $10.000 a plan review fee equal to 65% of the <br />building permit fee shall be paid. When plans are incomplete or changed so as to require <br />additional plan checking, an additional fee shall be paid based upon Table 3A of the <br />Uniform Building Code. <br /> <br />92. Insufficient Funds (NSF) check - $20 <br /> <br />93. Tax - 6.5%, maps, copies. <br /> <br />94. <br /> <br />Water Hydrant Deposit - $300 <br />A. Water used from hydrant - $1.30/1 ,000 gallons <br />B. Meter Deposit, 2- W' - $500 <br />C. 5/8" Meter Deposit - $85 <br />D. Wrench Deposit - $20 <br />E. Hose Deposit - $20 <br />F. Adapters - $20 deposit <br /> <br />95. Tree Removal - See City Forester <br /> <br />96. Planning Sign Deposit - $50 per sign <br /> <br />97. Park Dedication Fee <br /> <br />Residential: <br /> <br />0.0 -2.0 <br /> <br />Dwelling units/acre <br /> <br />$100/acre <br /> <br />2:1-3.0 <br /> <br />Dwelling units/acre <br /> <br />$150/acre <br /> <br />3.1-4.1 <br /> <br />Dwelling units/acre <br /> <br />$200/acre <br /> <br />4.1-5.0 <br /> <br />Dwelling units/acre <br /> <br />$250/acre <br /> <br />Over 5.0 <br /> <br />Dwelling units/acre <br /> <br />10% of land subdivision <br /> <br />Commercial/industrial <br /> <br />10% of land subdivision <br /> <br />1996 Fee Schedule Page 14 <br />