Laserfiche WebLink
MOUNDS ViEw <br /> PUBLIC WORKS <br /> 2401 HIGHWAY 10• MOUNDS VIEW,MN 55112 <br /> (763)717-4050•FAX(763)717-4019 <br /> www.ci.mounds-view.mn.us/publicworks <br /> IMPORTANT NOTICE <br /> ARDAN AVENUE STREET RECONSTRUCTION UPDATE <br /> Your property is located on a street that the City of Mounds View plans to reconstruct this summer as part of the 2014 <br /> Street and Utility Improvement Project—Area G. Public Works Engineering is finalizing the design phase of the project <br /> and would like to provide you an update on the proposed changes planned for Ardan Avenue. There is no direct cost or <br /> special assessment to you for these planned improvements. <br /> Background: <br /> Ardan Avenue is a designated roadway on the Municipal State Aid System (MSAS). This designation allows the City to <br /> receive funding from the State of Minnesota for its maintenance and construction costs. The City receives <br /> approximately $450,000 annually from this funding source. MSAS streets are required to meet State-Aid standards <br /> which require minimum lane widths,centerline striping,and designated parking lanes. <br /> Ardan Avenue is also designated to be a pedestrian/bicycle corridor in accordance with the City's Comprehensive Plan. <br /> The Comprehensive Plan is the City's "master plan" to guide future development through the year 2030. The <br /> pedestrian/bicycle corridors will create a citywide trail and sidewalk system when complete, connecting neighborhoods <br /> to parks,schools, library,civic centers,transit,shopping,and other neighboring city and regional trails and sidewalks. <br /> A public information meeting was held on October 21,2013 to present street design options and solicit public input. <br /> Planned Improvements: <br /> Ardan Avenue will be fully reconstructed with a new asphalt pavement section and vertical concrete barrier curbs like <br /> other recent street projects. A map showing the planned improvements is attached to this notice. <br /> Parking: Due to low traffic counts and infrequent use of on-street parking, a parking lane is planned on the south side <br /> only next to the eastbound traffic lane. On-street parking on north side will be prohibited. <br /> Pedestrian/Bicycle Accommodations: A 6-foot wide, off-street, concrete sidewalk is planned on the north side. The <br /> sidewalk will be located immediately behind the curb eliminating a turf boulevard strip. This sidewalk will be maintained <br /> by Public Works including snow removal. No dedicated bike lanes are planned, however,the parking lane on the south <br /> can serve as a shared-use lane for bicyclists,joggers,and others. <br /> A typical section of the planned roadway improvements is shown below. <br /> NORTH SOUTH <br /> R W R W <br /> 60' <br /> 6' <br /> 2'3 11' 11' 8' <br /> DRIVE LANE DRIVE LANE SHARED-USE <br /> z� PARKING LANE <br /> O' Q 1 <br /> NEW CURB O� }.T� O O O NEW CURB <br /> CONCRETE <br /> SIDEWALK <br /> (CITY MAINTAINED) STANDARD TYPICAL <br /> PAVEMENT SECTION <br /> If you have any questions or comments regarding this matter, please contact Public Works at(763)717-4050 or <br /> publicworksPci.mounds-view.mn.us. Thank you. <br />