Laserfiche WebLink
<br />5/1/91 <br /> <br />. <br /> <br />. <br /> <br />COST PARTICIPATION POLICY <br /> <br />. <br /> <br />Page 2 <br /> <br />RAMSEY COUNTY PUBLIC WORKS COST PARTICIPATION GUIDELINES FOR IMPLEMENTATION OF COUNTY POLICY AS OUTLINED IN RESOLUTION 9-1272 <br />FOR THE CONSTRUCTION, RECONSTRUCTION AND MAJOR MAINTENANCE OF ROAD IMPROVEMENTS. <br /> <br />CURRENT STANDARDS FOR THE DESIGN AND CONSTRUCTION OF COUNTY STATE AID HIGHWAYS SfffiLL APPLY FOR THE INTERPRETATION OF THESE <br />POLICIES. <br /> <br />(PERCENT) <br /> <br />CATEGORY <br /> <br />COUNTY SHARE OF <br />FEDERAL PROJECT * <br /> <br />CSAH >5000 <br />POPULATION <br /> <br />COUNTY ROAD <br /> <br />CSAH <5000 POPULATION <br />& WHITE BEAR TOWNSHIP <br /> <br />Other Utilities <br /> <br />(telephone, gas, <br />cable tv, electric, <br /> <br />pipelines, etc.) <br /> <br />Traffic Signals ** <br /> <br />Intersecting <br />Streets <br /> <br />Retaining Walls <br /> <br />Grading behind <br />Curb <br /> <br />Sidewalks (new) <br /> <br />Sidewalks <br /> <br />(replacement) <br /> <br />Bituminous <br />Bikepath (new) <br /> <br />o inside existing R/W <br />100 outside R/W <br /> <br />o <br /> <br />o <br /> <br />100 of county legs <br /> <br />100 of county legs <br /> <br />100 of county legs <br /> <br />ratio of surface <br />participation items <br /> <br />ratio of surface <br />participation items <br /> <br />ratio of surface <br />participation items <br /> <br />25 *** <br /> <br />o <br /> <br />25 *** <br /> <br />100 <br /> <br />o <br /> <br />100 <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />100 if in serviceable 0 <br />condition & required <br />for travel lane <br />construction <br /> <br />100 if in serviceable <br />conditi.on & required <br />for travel lane <br />construction <br /> <br />25 if on approved <br /> <br />system & funds are <br />available <br /> <br />25 if on approved <br /> <br />system & funds are <br />available <br /> <br />25 if on approved <br />systems & funds are <br />available <br /> <br />* Federal participation is estimated to be 50 to 77\ of eligible items. <br /> <br />o inside existing R/W; <br />nonfederal share outside R/W <br /> <br />100 of nonfederal share of <br />county legs <br /> <br />ratio of surface participation <br />items of nonfederal share <br /> <br />100 of nonfederal share <br /> <br />100 of nonfederal share <br /> <br />o of nonfederal share <br /> <br />100 of nonfederal share if in <br />serviceable condition & <br />required for travel lane <br />construction <br /> <br />o <br /> <br />** Traffic signal construction is addressed in a separate policy (County Board Resolution 81-1001). <br /> <br />*** Retaining walls constructed in lieu of right of way acquisition. <br />