Laserfiche WebLink
<br />RESOLUTION 4263 <br />~ PAGE FIVE OF EIGHT <br /> <br />g. To the extent required as a result <br />of the sale of stock and transfer of <br />control, North Central and City <br />agree to the replacement of any and <br />all letters of credit, bonds, <br />insurance certificates, or other <br />forms of security provided to the <br />City pursuant to the terms of the <br />Franchise. <br /> <br />h. <br /> <br />~ <br /> <br />~ <br /> <br />North Central shall have agreed to <br />conduct "proof of performance tests" <br />as required by the FCC, with 50% of <br />the test sites selected by <br />Commission on the scheduled day of <br />the tests, and any sweeping and <br />balancing of the system required as <br />a result of the random end-of-line <br />performance tests. In addition, <br />North Central shall have agreed to <br />conduct an annual sweep and balance <br />of the trunk cable system, and a bi- <br />annual (every other year) sweep and <br />balance of the distribution system. <br /> <br />i. <br /> <br />North Central shall have agreed to <br />contribute to the Commission two (2) <br />Di-tech frames each with a capacity <br />of forty (40) inputs by fifteen (15) <br />outputs for the purpose of enhancing <br />the North Suburban Access <br />Corporation's responsibility for <br />insti tutional and subscriber network <br />switching. North Central shall <br />purchase for the Shoreview headend a <br />new Di-tech switcher with thirty-two <br />(32) inputs and sixteen (16) outputs <br />for institutional and subscriber <br />network switching. In the event the <br />Shoreview headend should no longer <br />be utilized by North Central, this <br />switcher shall at the expense of <br />North Central be moved to and <br />utilized for the same purpose at the <br />commission's master control operated <br />by the access corporation. The <br />access corporation agrees to assume <br />responsibility for switching on the <br />institutional network. <br />