Laserfiche WebLink
�� ADDENDUM I <br />The proposed budge[ brr.okdown for tl�e Mound:� Vicw bike trail sytitem:reads � <br />:�a [ollowa: � � � <br />SuA grade prcparation - <br />Rull and grade 10,560 feet of linear trail <br />a. 200 hours of m�nual labor @$7.02/hour = $1,404.00 * <br />b. renta�l of roller for 80 I�ours (� $10.00/hour = A00.00 * <br />c. SU liours fieLd supervision = 775.00 * <br />d. 120 hours of program ndminis[raHon = 1,055.00 +� <br />$4,034.00 * <br />Bike ttail way surface <br />a. 1fl,560 ft. of 2" Bituminous Surface - 8' pat1� <br />@ S2.25/ft. _ $23,760.00 <br />b. 80 hours uf field supervision = 775�.00 * <br />c. 40 hours of program administration 352.OQ * <br />$24,887.00 <br />Slgnage and Pain[ing <br />a. 100 l�ours oF inanual labor l$7.02/hour = $ 702.00 + <br />b. 40 hours of field supervlsion = 388.00 * <br />c. 40 hours of prugram administration = 176.00 * <br />d. [rail way signage 50 signs @$20.00 ca. 1,000.00 * <br />e. Paint supplies = 493.00 * <br />$2,759.00 <br />Total 6udgered cos[ for cumpleced trail wny sys[em $31,680.00 <br />*The Citv-of Mounds View will be paying Chc ctarred items as their 25% share <br />of ti�e prepused project which wcals $7,9'l0.00. � <br />