Laserfiche WebLink
plemo to Barry Bauer PaKe 5 <br />AC Chis [ime [he Ci[y would con[ribu[e $25,000.00 Cawacds [he [ennis cour[ <br />construc[ion wi[h the Schools underwriting the remnining $114,000.00. In <br />addi[ion [o the City's financial con[ribution [he City would serve as the <br />genexal contractor and pxovide onsi[e inspec[ions an�i io-house engineering needs. <br />There are two major areas [ha[ have not been addressed at [his poinL• <br />1. Maintenance of the facility incluing mowing, breakdowns, future zepairs <br />and general upkeep. <br />2. 7oint powers agreemen[ ou[lining cost, [ime usage ancl genetal con[col. <br />Both of these 3ssues should be dealt with in 3ep[h by a task force established <br />through Co�unity Educatian consisting of bo[h Ci[y and School personnel. <br />In addiCion to The text poxtion of this repor[ we have included a variety of <br />brochures from differene manufacturers outlining some of. [he possible equipment <br />designs, styles and costs in Addendum B. <br />M overview mncep[ plan witii facility locations can be found in Addendum C. <br />.T.£ you have any questions concerning this proposal, feel £ree to give me a <br />call at 784-3055. <br />