My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMMISSION_MINUTES_1978-07-27
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Minutes
>
1970-1979
>
1978
>
COMMISSION_MINUTES_1978-07-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2022 11:54:36 AM
Creation date
9/5/2014 9:24:44 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEt� 1b: Parks and Recreation commissioneca <br />FROM: S[aff <br />DATE: July 21, 1978 <br />RS: 1974 L.A.W.C.O.N. Gran[s <br />Staff ia preaen[ly in the process of preparing the S[ate Land and Water <br />Conservation Grants for fund3ng in 1979. <br />We will be submitting [�ao gzant applications, one for the Phase 1 develop- <br />ment of Silver View Park, the second is for the tennis court project at <br />Edgevood Js. High. <br />A briei synopsis of each project including [he proposed costs are as followa: <br />1. Edgewood 7r. High Tennis Courts - This projec[ will be for the <br />wnstruction of four lighted championship tennis courts. The couxts <br />will be located at the sou[hwest corner of the school grounds, <br />making op[3mum use of [he exis[ing parking lot. <br />The [otal projected cost is $50,000 including final si[e prepara- <br />tion, 2 lifts of blacktop, fencing, color coating, coin metered <br />lighting system, nets and posts. <br />The L.A.W.C.O.N. funding will pay For 50% of the project or $25,000 <br />which would�be [he city's share of the project as the school distrlct <br />has already budgeted $25,000. <br />The second projec[ that Ss being su6mi[[ed is for Phase 1 of the Silver View <br />Park Develop�n[. The developmen[ of Silver View has been proposed to be <br />completed in [hree phases: ' � <br />Phase 1- This phase will include all preliminary grading, parking lot <br />constructian and trail developmen[. <br />Pheae 2- This phase will consist mainly of ehe construction ot the �aajor <br />recreaLion facilitiea including tennis cour[s, baseball fields, hockey <br />rinke, turf es[ablishment and park signage. <br />phase 3- This phase is for the construction of a Community Center Build:ng. <br />A more detailed breakdown of the Phase 1 Development is as follows: <br />� <br />Surveying: $ 3,000 <br />Grading and Excavatian: 24,000 <br />Patking Lots Construc[ion: 40�000 <br />Trail Developmen[: 20,000 <br />TOTAL $87,000 <br />1fie Ci[y's matc77ing share of the grartt would be 25X or $21,750. <br />AC this poin[ the proposal�; we are submit[ing are only preliminary grant <br />applicatidns. <br />If our preliminary propoRal siiould be accep[ed� we would [hen go back and <br />finalize our figures and present a nore formal report to the Council. <br />
The URL can be used to link to this page
Your browser does not support the video tag.