Laserfiche WebLink
A�mo to 6fark -2- August 11, 1978 <br />2. Gopher Electric can re-connect the existing service at a �� <br />cost of j350.00 which will include underground service . <br />£rom the existing main to the new location. /'", .. <br />3. The gas re-connection would cost approximately $400.00 to � <br />stub in off Lambert Avenue to the new location. <br />4. Re-location of existing water main would be done in-house. � <br />The total cost of re-location would be a maximum of �� <br />s950.00. It should be noted that if we were to ever develop <br />the park or replace the park shelter building in the future, <br />xe would need to provide the electrical and gas service � <br />anyway to the proposed location. <br />Siaff would recommend that the §950.00 cost be to the City's <br />Contingency Fund as there are no monies available at this tine in <br />the Park and Playgraund Fund. <br />A second alternative is to leave the building in its existing <br />location and locate the tot lot along Lambert Avenue. <br />A thizd alternative is to postpone the buiiding of the tot lot <br />until a recommendation is made by the Park Shelter Building Task <br />Force. <br />The Parks and Recreation Commission has formally adopted the .. �. <br />proposal of re-locating the park shelter building as staff �:�'-`� <br />rccommended but they were not aware of the $950.00 costs at that . <br />time. <br />Staff's recommendation is that the building should be re-located <br />to the proposed location and the costs should be assessed tr� tha <br />City's Contingency Fund for the reasons as presented in the staff � <br />repo:^t. <br />Staff will be available for the City Council meeting on Monday if <br />you feeL it would be necessary. � '-. <br />`ti <br />