My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMMISSION_MINUTES_1978-07-27
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Minutes
>
1970-1979
>
1978
>
COMMISSION_MINUTES_1978-07-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2022 11:54:36 AM
Creation date
9/5/2014 9:24:44 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEPAPTMENT OF PAFKS, <br />� <br />C►f � Mou�dsV�e� <br />� flAMSEVCOUNTV,MINNE50TA <br />'1901 NIGHWAV l0 <br />MOUNOS V IEW, MINN.6511Y <br />RECREATION ANDfORESTflV <br />�7u].y 25� 197b <br />MEt11 10: Pazks and Recrnation Conm�issioners <br />FROM: Staff <br />RE: Playgmund equipment for Oakwood and Lambert Parks <br />After aeetinq with four sales representatives and personally visiting a <br />variety of playgmund aites, I would reco�end the £ollowing equipment be <br />purchased for Oakwood and Lambert Parks: <br />Oakwood Park - Ae equipment ehould be installed in the Northeast <br />quadrant of the park where the existing equipment presently is. ffie <br />existing equipment should be removed and brought up to Ardan Pazk for <br />future fnstallation. <br />ffie majoz piece of equipsent sta£f recommiends for Oakvrood is the <br />Big 1by, SB-11 which requires a 31' x 35' space for installation. <br />The cost is approximately 52.400.00 which includes freight. <br />In addition to the SB-11 we would recommend 3 spring animals and <br />2 backhoe diggera fmm Game Time at a cost of $672.00. <br />The total cost for Oakwood including ties and sand would be amtu�d <br />53.400.00. <br />Lambert Perk - 1fie equipment proposed at Lambert PaEk i9 basically <br />a mvnz-qbsf:a�xP course. The tqt loL,�l(��ation is pxoposed to�;q��in <br />tl�e .,vuwxxi:,� uurner of the ptirk wiliW� w�uid neceseitate moving the <br />existing�park ahelter building. <br />The equipment that we propose to co�rise the obstacle course is as <br />followa: <br />SB-19 $ 693.00 <br />SB-15 380.00 <br />SB-16 305.00 <br />SB-18 339.00 <br />SB-19 189.00 <br />SB-22 $ 376.00 <br />4G 260.00 <br />Sub 1bta1 $2,542.00 <br />Freight 350.00 <br />TOTAL $2,892.00 <br />The total cost pmjected for Lambert Park is 53,600.00 including ties � <br />and eand. <br />� <br />Staff will have models available For your review at the lfiuraday Commieeion <br />oeeting. In addition staff will provide cataloga of othes manufacturerr' <br />playground equipment for your raview end co�arison. <br />... ....<-,� <br />
The URL can be used to link to this page
Your browser does not support the video tag.