Laserfiche WebLink
Dlemo to Mark -2- August 11, 1978 � <br />2. Gopher Electric can re-connect the existing service at a ; <br />cost of $350.00 which will include underground service �' <br />from the existing main to the new location. �� <br />3. The gas re-connection would cost approximately $400.00 to <br />stub in off Lambert Avenue to the new location. �� <br />4. Re-location of existing water main would be done in-house. <br />The total cost of re-location would be a maximum of <br />$950.00. It should be noted that if we were to ever develop <br />the park or replace the park shelter building in the future, <br />we would need to provide the electrical and gas service <br />anyway to the proposed location. <br />Staff would recommend that the $950.00 cost be to the City's <br />Contingency Fund as there are no monies available at this time in <br />the Park and Playground Fund. <br />A second alternative is to leave the building in ies existing <br />location and locate the tot lot along Lambert Avenue. <br />A third alternative is to postpone the building of the tot lot <br />until a recommendation is made by the Park Shelter Building Task <br />Fores. <br />The Parks and Recreation Commission has formally adopted the <br />proposal of re-locating the park shelter building as staff � <br />recommended but they were not aware qf the $950.00 costs at that ��� <br />time. <br />Staff's recommendation is that the building should be re-located <br />ta the proposed location and the costs should be assessed to the <br />City's Contingency Fund for *_he reasons as presented in the staff <br />seport. <br />Staff will be available for the City Council meeting on �fonday if <br />you feel it would be necessary. <br />� <br />