My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMMISSION_MINUTES_1978-08-24
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Minutes
>
1970-1979
>
1978
>
COMMISSION_MINUTES_1978-08-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2022 11:54:36 AM
Creation date
9/5/2014 9:24:46 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dlemo to Mark -2- August 11, 1978 � <br />2. Gopher Electric can re-connect the existing service at a ; <br />cost of $350.00 which will include underground service �' <br />from the existing main to the new location. �� <br />3. The gas re-connection would cost approximately $400.00 to <br />stub in off Lambert Avenue to the new location. �� <br />4. Re-location of existing water main would be done in-house. <br />The total cost of re-location would be a maximum of <br />$950.00. It should be noted that if we were to ever develop <br />the park or replace the park shelter building in the future, <br />we would need to provide the electrical and gas service <br />anyway to the proposed location. <br />Staff would recommend that the $950.00 cost be to the City's <br />Contingency Fund as there are no monies available at this time in <br />the Park and Playground Fund. <br />A second alternative is to leave the building in ies existing <br />location and locate the tot lot along Lambert Avenue. <br />A third alternative is to postpone the building of the tot lot <br />until a recommendation is made by the Park Shelter Building Task <br />Fores. <br />The Parks and Recreation Commission has formally adopted the <br />proposal of re-locating the park shelter building as staff � <br />recommended but they were not aware qf the $950.00 costs at that ��� <br />time. <br />Staff's recommendation is that the building should be re-located <br />ta the proposed location and the costs should be assessed to the <br />City's Contingency Fund for *_he reasons as presented in the staff <br />seport. <br />Staff will be available for the City Council meeting on �fonday if <br />you feel it would be necessary. <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.