My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMMISSION_MINUTES_1978-11-02
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Minutes
>
1970-1979
>
1978
>
COMMISSION_MINUTES_1978-11-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2022 11:54:36 AM
Creation date
9/5/2014 9:24:50 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GIITEWAY � TO TNE NoKen <br />OEPAFTMENT OF VARKS, <br />RECREATION AN� FOR'_STR� <br />C�f of I�ou��s Veu� <br />5 RAMSEVCOUNTV MINNESOTA <br />0401 NIGHWAV 10 <br />MOUNDS V IEW, MINN. 65113 <br />hiEMO T0: Mounds View parks and Aecreation Commissioners <br />FROM: Staff <br />DATE: October 31, 1978 <br />RE: Park Development <br />The following park development projects have been either started <br />or completed during the last month: <br />Edgewood Jr. Hi�h - The only phase left to complete is the <br />ac stops w i7i will be constructed beginning next week by <br />U. S. Steel Inc. <br />Oakwood Tot Lot - The tot lot staucture is up and completed <br />ut t e outer pesimeter is still being worked on. <br />Lamhert Tot Lot - 7'ge hockey rink has been installed, and the <br />ui ing as een moved including the new electric and gas <br />hook-up. <br />The tot lot has been graded and we hope to commence construc- <br />tion early next week. See the reverse side for a possible <br />perimeter design. <br />Greenfield Hockey gink - The bids have been let and the <br />g�ing completeT— a the hockey rink at Greenfield Park. <br />The lighting contract has been awarded to Collins Electric <br />and the rink material bid was awarded to Siwek Lumber and <br />Miliwork. <br />The lighting contractor began work on October 31 and we expect <br />the material to be delivered in three weeks. <br />We are taking the existing pleasure skating light pole from <br />Greenfield and having it re-located at Edgewood School. <br />Pinewood Ballfields - All three fields have been completed <br />Lo everyone s satisfaction. <br />Woodcrest Park - Two trees have been replaced that had died <br />an t e ence for catching pucks has been constructed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.