My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMMISSION_MINUTES_1978-11-02
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Minutes
>
1970-1979
>
1978
>
COMMISSION_MINUTES_1978-11-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2022 11:54:36 AM
Creation date
9/5/2014 9:24:50 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GRTEWAY <br />OEPAflTMENT OFPAHK�. <br />RECREATION ANf]FORESTNV <br />C�� o� Mou�dSV�e� <br />5 flAMSEY COUNTV MINNESOTA <br />3G01 MIGMWAV 10 <br />MOUNOS V IEW, MINN. 55f 12 <br />MEMO T0: hiounds View Parks and Recreation Commissioners <br />FROAf: Staff <br />DATE: October 31, 1978 <br />RE: Park Development <br />The following park development projects have been either started <br />or completed during the last month: <br />Edgewood Jr. High - The only phase left to complete is the <br />ac stops w ic will be canstructed beginning next week by <br />U. S. Steel Inc. <br />Oakwood Tot Lot - The tot lot structure is up and completed <br />ut t e outer perimeter is still being worked on. <br />Lambert Tot Lot - The hockey rink has been installed, and the <br />ui ing as een moved including the new electric and gas <br />hook-up. <br />The tot lot has been graded and we hope to commence construc- <br />tion early next week. See the reverse side for a possible <br />perimeter design. <br />Greenfield Hockey Rink - The bids have been let and the <br />g� r�a 'ing comp ete or the hockey rink at Greenfield Park. <br />The lighting contract has been awarded to Collins Electric <br />and the rink material bid was awarded to Siwek Lumber and <br />Millwork. <br />The lighting contractor began work on October 31 and we expect <br />the material to be delivered in three weeks. <br />We are taking the existing pleasure skating light pole from <br />Greenfield xnd having it re-located at Edgewood School. <br />Pinewood Ballfields - All three fields have been completed <br />to everyone s satisfaction. <br />Woodcrest Park - Two trees have been replaced that had died <br />an t— i�T—fence for catching pucks has been constructed. <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.