My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012 EDC
MoundsView
>
Commissions
>
Economic Development Commission (Disbanded)
>
Agenda Packets
>
2010-2019
>
2012
>
2012 EDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2015 11:06:45 AM
Creation date
1/6/2015 11:05:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Premium Stop Redevelopment Area Study <br /> • <br /> Redevelopment Staging <br /> Projectg g <br /> The redevelopment master plan for the Premium Stop Redevelopment Area has been designed in a way to <br /> be phased in over time as parcels located in the redevelopment site become available. The master plan has <br /> been defined as short-, mid- and long-term redevelopment potential, which will allow the plan to be flexible <br /> and redevelopment to occur regardless of which parcels become available for development. In addition, the <br /> master plan will allow for existing buildings to remain as part of the overall redevelopment of the Premium Stop <br /> Redevelopment site as long as these buildings were altered in their location and their exterior appearance to <br /> be in keeping with the site plan and design guidelines articulated in the master plan. <br /> Implementation Strategy: Planned Unit Development Overlay District <br /> To accomplish the goals of the Premium Stop Redevelopment Study, the city will consider an overlay zoning <br /> district that would provide standards and procedures beyond what is contained in the zoning ordinance for <br /> the underlying districts along the Highway 10 corridor. This Planned Unit Development Overlay District, to be <br /> developed in detail by city staff and consultants in conjunction with the Planning Commission and City Council, <br /> could include the following: <br /> 1)All projects on property within a certain defined area along the corridor- perhaps 300 feet from the right- <br /> of-way, or another distance to be determined -would be approved only upon application for a planned <br /> 40 unit development (PUD) in accordance with the standards for PUDs in the Mounds View zoning code, the <br /> additional standards of the overlay district, and the goals of the corridor study. <br /> 2)The uses allowed within the overlay will include all permitted, conditional, and accessory uses in the <br /> underlying district, plus other uses integrated into the project, upon a finding by the City Council that such uses <br /> within the overall project further the goals of the corridor study. Specifically, mixed use projects, integrating <br /> retail, office, and residential uses both horizontally and vertically will be encouraged. <br /> 3) Site planning standards within the overlay district will include requirements for building placement close to <br /> the street, parking to the side and rear, maintenance of a street edge by means of a fence, railing, or hedge, <br /> and screening of loading areas and trash receptacles from view of public streets, the front yard of neighboring <br /> properties, and adjacent residential areas. Setbacks within the overlay district will be modified from the <br /> standards in the underlying district to encourage this building placement through the use of build-to lines, <br /> reduced or zero side setbacks where appropriate, and other considerations to implement the overall intent of <br /> the corridor study. <br /> 4)Architectural standards within the overlay district will be more rigorous than in the underlying district, <br /> including increased use of durable building materials such as brick, stone, and glass, and reduced use or <br /> prohibition of wood, sheet metal, and plain concrete block <br /> Commercial Development <br /> The desired outcome for the commercial development on the Premium Stop Redevelopment Area is to <br /> maintain and improve the commercial area as a vital retail and service location along County Road 10. The <br /> main objectives for the commercial development are as follows: <br /> 411 1. Identify and recruit business types that will be successful in this location and support land use densities <br /> and values that make redevelopment financially feasible. This may require authorization of some <br /> 16 City of Mounds View <br />
The URL can be used to link to this page
Your browser does not support the video tag.