Laserfiche WebLink
<br />. <br /> <br />EXHIBIT B <br /> <br />COST SRI\RING AGREEMEKT <br />FOR PROJECTS COKSTRUCTED ANOKA CaCKTY <br />USING COl7NTY STATE .AlD FUNDS OR LOC.Al- TAX LEVY DOLLARS <br /> <br />Item <br />Bikeways <br />Concrete Curby & Gutter <br />Concrete Sidewalk <br />Concrete Sidewalk Replacement <br />Concrete Curb & Gutter for Median <br />Construction <br />Concrete Median <br />Construction or Adjustment of Local <br />Utilities <br />Grading, Base & Bituminous <br />Storm Sewer <br /> <br />Count'.' Share <br />o <br />50% <br />o <br />100% <br /> <br />Citv Share <br />100% <br />50% <br />100% <br />o <br /> <br />100% <br />100% <br /> <br />o <br />0*1 <br /> <br />o <br />100% <br />Based on State <br />Aid Letter*2 <br />0*6 <br />112 of the eost of its <br />legs of the intersection <br /> <br />100% <br />o <br />Based on State <br />Aid Letter*2 <br />100% <br />the cost of its leg of <br />the intersection plus 'l'2 <br />the cost of the County <br />legs of the intersection <br /> <br />Driveway Upgrades <br />Traffic Signals (communities larger <br />than 5,000) <br /> <br />Traffic Signal (communities less <br />than 5,000) <br />Engineering Services <br />e.ght-of-Way <br />eet Lights <br /> <br />.6 <br /> <br />100% <br />*4 <br />100% <br />o <br /> <br />0*3 <br />*4 <br />0*5 <br />100% <br /> <br />*1 <br /> <br />The County pays for 100% of a Standard Median Design such as plain concrete. If a community requests decorative <br />median such as red brick, stamped concrete, or exPosed aggregate concrete the City will pay the additional cost above <br />the cost of standard median. <br /> <br />*2 <br /> <br />In the event no State Aid is being used, drainage cost shares ",rill be computed by proportions of total area to County <br />area where the area of the road right-of-way is doubled prior to performance of the calculations. <br />In communities less than 5,000 people the County pays for 100% of the cost of the traffic signal effective March 1986. <br />The County collects on behalf of the cities (less than 5,000) "Municipal State Aid Dollars" since they do not themselves <br />qualify for state aid funds. These funds are used to pay the City Share. <br /> <br />*3 <br /> <br />*4 <br /> <br />Engineering shall be paid by the Lead Agency except that any participating agency will pay construction engineering <br />in the amount of 8% of the construction costs paid by that agency. <br /> <br />*5 <br /> <br />In the event that the City requests purchase of right-of-way in excess fo those right-of-ways required by County <br />construction, the City participates to the extent an agreement can be reached in these properties. For instance, a City <br />may request a sidewalk be constructed alongside a County roadway which would require additional right-of-way, in <br />which case the City may pay for that portion of the right-of-way. Acquisition of right-of-way for new alignments shall <br />be the responsibility of the City requesting the alignment. In addition, any costs incurred by the County because the <br />participating City did not acquire sufficient right-of-way shall be paid by the City. <br /> <br />The County will replace all driveways in-kind. Upgrades in swfacing (i.e., gravel to bituminous, bituminous to <br />concrete) shall be at 100% expense to the City. b:\jpaexhib.fim <br />