My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5834
MoundsView
>
City Council
>
City Council
>
Resolutions
>
5500 - 5999 (2000-2003)
>
Resolution 5834
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 10:14:38 AM
Creation date
1/31/2007 1:59:48 PM
Metadata
Fields
Template:
MV City Council
City Council Document Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />13. The City shall pay 100% or the cost of any street lighting <br />included in the project. The design and installation of ornamental streetlights shall be in <br />accordance with the County's specifications. The City's estimated cost for street lighting <br />is $0.00. <br /> <br />14a. The City shall pay to the County 12.5% of the cost of <br />construction and installation of the whole traffic actuated signal system (including <br />County supplied materials). The City's estimated share of the construction is $25,375.00. <br /> <br />14b. The County shall pay 100% of all interconnect costs. <br /> <br />14c. The City shall pay 37.5% of Emergency Vehicle Pre- <br />emption (EVP) costs. The City's estimated share of the construction is $4,875.00. <br /> <br />15. The City shall pay 8% of the construction costs of City <br />participating items for Construction Engineering ServiCes (excluding County supplied <br />materials). The City's estimated share of Construction Engineering Costs is $2,610.45 <br /> <br />summarized below: <br /> <br />16. The total estimated cost to the City for the project is <br /> <br />. <br /> <br />1. Construction or Adjustment of Local Utilities <br />2. Grading, Base & Bituminous <br />3. Storm Sewer <br />4. Concrete Curb & Gutter <br />5. Decorative Medians <br />6. Driveway Upgrades <br />7. Concrete Sidewalk <br />8. Trails <br />9. Street Lights <br />10. Traffic Signals <br />11. EVP <br />12. Construction Engineering Services <br />13. Total Estimated Cost To The City <br />14. Federal Funding for City's share <br />15. Total Estimated City Cost pa)Table to the County <br /> <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />$ 2,913.60 <br />$ 0.00 <br />$ 1,092.04 <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />$ 25,375.00 <br />$ 4,875.00 .. <br />$ 2.610.45 <br />$ 36,866.09 <br />$ 19.267.50 <br />$ 17,598.59 <br /> <br />C. The total estimated cost to the City for the project is $17,598.59 as shown <br />on the attached Exhibits A and B. <br /> <br />. <br /> <br />D. Upon award of the contract, the City shall pay to the County, upon written <br />demand by the County, 95% of its portion of the cost of the project estimated at <br />$16,718.66. The City's share of the cost of the project shall.include only construction and <br />construction engineering expense and does not include administrative expenses incurred <br />by the County. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.