Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />RESOLUTION NO. 4208 <br />PAGE FIVE <br /> <br />(b) equipment over 100,000 BTU <br />hour capacity (12,000 <br />per ton) <br /> <br />4. Signs. Billboards. (no surcharge) <br />(a) signs up to 100 square feet <br /> <br />(b) signs 100 square feet <br /> <br />(c) signs: refacing or <br />altering <br /> <br />$35.00 plus <br />$2.00 per <br />100,000 BTU per hour <br />or fraction thereof <br />over 100,000 BTU per <br />hour capacity <br /> <br />$30.00 for the <br />first 25 sq. plus $5 <br />for each additional <br />25 sq. ft. or <br />fraction thereof <br />up to 100 sq. ft. <br /> <br />$60.00 for the <br />first 100 sq. <br />ft. plus $10 <br />for each <br />additional 100 <br />sq. ft. or <br />fraction <br />thereof <br /> <br />$15.00 per <br />installation <br /> <br />5. Heatinq and ventilation Work (plus State surcharge) <br /> <br />(a) gas, oil burner equipment <br /> <br />(b) gravity warm air heating <br /> <br />(c) mechanical warm air heating <br /> <br />(d) duct or tin work <br /> <br />$25.00 plus $5.00 <br />per 100,000 BTU per <br />hour or fraction <br />thereof over 100,000 <br />BTU per hour input <br /> <br />$35.00 per <br />installation repair, <br />alteration or <br />extension <br /> <br />$25.00 plus $5.00 <br />per 100,000 BTU per <br />hour or fraction <br />thereof over 200,000 <br />BTU per <br />hour input capacity <br /> <br />Use Valuation <br />Table <br />