Laserfiche WebLink
V. PUBLIC WORKS RELATED FEES <br /> CALL-OUT RATE SCHEDULE (used for all hourly-based fees in this chapter) <br /> Normal Business Hours for Call-out Rates 7:00 a.m. to 3:30 p.m., Monday thru Friday <br /> Standard Call-out Rate: Specified time $50 per hour specified <br /> conducted entirely within normal business <br /> hours <br /> After-Hours Call-out Rate: Specified time $100 per hour specified <br /> conducted outside normal business hours <br /> Holiday Call-out Rate: Specified time $150 per hour specified <br /> conducted on holidays <br /> RIGHT-OF-WAY MANAGEMENT FEES (Chapter 910) <br /> Excavation Permit Fees:* <br /> Hole Fees: <br /> Boulevard Areas $100 per hole excavated <br /> Pavement Areas $200 per hole excavated <br /> Underground Utility Work (requires Hole <br /> Fee): <br /> Open Trenching— Boulevard Areas $50 per 100 lineal feet or fraction thereof <br /> Open Trenching— Pavement Areas $70 per 100 lineal feet or fraction thereof <br /> Trenchless Installation $35 per 100 lineal feet or fraction thereof <br /> Overhead Installation $25 per 100 lineal feet or fraction thereof <br /> Obstruction Permit Fees:* <br /> Pavement Obstruction Fees: <br /> New Obstructions $100 per obstruction <br /> Replacing Existing Obstructions (in-kind) $50 per obstruction <br /> Temporary Obstruction Fees: <br /> Dumpsters, Portable Restrooms, etc. $25 per obstruction <br /> Equipment Used for Excavation Permit No charge <br /> Other ROW Management Fees and Costs: <br /> Registration Fee (ROW Users & Registrants) $30 <br /> Permit Extension $30 <br /> Delay Penalty 10% of ROW Permit <br /> Degradation Fee Calculated at time of permit <br /> Restoration Cost Calculated at time of permit ($5,000 min.) <br /> Overhead Utility Line Repair No charge <br /> Street Curb Alteration $50 <br /> Temporary Access $25 per access <br /> Penalty for Work Done without a Permit Double Fee <br /> Discount For Work Done with City Project 50% <br /> *Additional fees may be required for legal and engineering costs incurred by the City <br /> 2017 Fee Schedule Page 19 of 21 <br />