My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes - 2015/04/13
MoundsView
>
Commissions
>
City Council
>
Minutes
>
2010-2019
>
2015
>
Minutes - 2015/04/13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 9:24:13 AM
Creation date
9/19/2017 1:30:33 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Minutes
MEETINGDATE
4/13/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View City Council April 13, 2015 <br />Regular Meeting Page 6 <br /> <br />the reimbursement would be made incrementally and would not be taken all at once. <br /> <br />Mayor Flaherty asked if the City took MSA funds for these proposed routes. Interim Public <br />Works Director Peterson stated the City has not received funding for these proposed routes in the <br />past 20 years. <br /> <br />Finance Director Beer noted that the City received roughly $325,000 in funding from the State <br />each year for MSA streets. <br /> <br />MOTION/SECOND: Gunn/Meehlhause. To Waive the Reading and Adopt Resolution 8395, <br />Approving the Revocation of MSAS Streets. <br /> <br /> Ayes – 5 Nays – 0 Motion carried. <br /> <br />F. Resolution 8396, Approving Bid Documents and Authorizing Advertisement <br />of Bids for the Silver View Park Trail Rehabilitation Project. <br /> <br />Project Coordinator Stenglein explained Silver View Park Trail was originally constructed <br />around the pond in wood chips. The trail was converted to asphalt in 1993. The specifications <br />for this trail required an eight-foot wide trail with four inches of aggregate base. He reported that <br />this trail has failed due to environmental degradation, poor soil conditions and was in need of <br />rehabilitation. <br /> <br />Project Coordinator Stenglein indicated that in September of 2014, geotechnical samples were <br />taken along the trail and it was found that organic material and wood chips were the base for the <br />trail. AET was recommending that the trail be reconstructed with two inches of asphalt and eight <br />inches of base material. He noted that Bolton & Menk met with AET to discuss the use of the <br />trail. <br /> <br />Project Coordinator Stenglein reported that staff has been working with Bolton & Menk to <br />finalize the specifications for the trail. He noted that the project was anticipated to cost over <br />$100,000, which would require the public bidding process. Staff recommended that the Council <br />approve the bid documents and authorize staff to advertise for bids for Silver View Park Trail <br />rehabilitation project. <br /> <br />Mayor Flaherty asked how much the City budgeted for this project. Project Coordinator <br />Stenglein explained that the Council budgeted $150,000 in 2015 for the trail rehabilitation. He <br />indicated the estimate for the project was approximately $340,000. <br /> <br />MOTION/SECOND: Mueller/Meehlhause. To Waive the Reading and Adopt Resolution 8396, <br />Approving Bid Documents and Authorizing Advertisement of Bids for the Silver View Park <br />Trail Rehabilitation Project. <br /> <br /> Ayes – 5 Nays – 0 Motion carried. <br />
The URL can be used to link to this page
Your browser does not support the video tag.