Laserfiche WebLink
Ordinance 883 <br />Page 3 <br />SECTION 4. The City Council of the City of Mounds View hereby adds Chapter 1128 to <br />of the Mounds View Zoning Code pertaining to Renewable Energy Systems by deleting <br />the striE� language and adding the underlined text as follows: <br />CHAPTER 1128 <br />1128.01: PURPOSE: The purpose of this chapter is to promote safe effective and <br />efficient use of alternative energy sources and systems as the technology becomes <br />available The intent is also to establish standards and procedures by which the <br />installation and operation of these renewable energy systems shall be governed within <br />the City <br />1128.02: DEFINITIONS: When used in this Chapter, the following words and <br />phrases shall have the meanings ascribed to them in this Section, except where the <br />context clearly indicates a different meaning: <br />ACTIVE SOLAR ENERGY SYSTEM: A solar energy system whose primary purpose is <br />to harvest energy by transforming solar energy into another form of energy or <br />transferring heat from a collector to another medium using mechanical, electrical, or <br />chemical means. <br />BUILDING -INTEGRATED SOLAR SYSTEM: An active solar system that is an integral <br />part of a principal or accessory building rather than a separate mechanical device <br />replacing or substituting for an architectural or structural component of the building. <br />Building -integrated systems include but are not limited to photovoltaic or hot water <br />solar systems that are contained within roofing materials, windows, skylights, and <br />awnings. <br />CLOSED LOOP GROUND SOURCE HEAT PUMP SYSTEM: A system that circulates <br />a heat transfer fluid typically food -grade antifreeze through pipes or coils buried <br />beneath the land surface or anchored to the bottom in a body of water. <br />FEEDER LINE: Any power line that carries electrical power from one or more wind <br />turbines or individual transformers associated with an individual wind turbine to the point <br />of interconnection with the electric power grid In the case of interconnection with the <br />high voltage transmission systems the point of interconnection shall be the substation <br />serving the WECS. <br />