My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-09-2013 CC
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2013
>
09-09-2013 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:57 PM
Creation date
2/27/2018 2:20:56 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
9/9/2013
Supplemental fields
City Council Document Type
City Council Packets
Date
9/9/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ordinance 883 <br />Page 11 <br />i. Utility Company Interconnection. Prior to the installation or erection of a <br />WECS the operator must provide evidence showing their regular electrical <br />service provider has been informed of the customer's intent to install an <br />interconnected customer -owned generator. Off -grid systems shall be exempt <br />from this requirement. All connections shall be underground. <br />j. Compliance with State Building Code. A standard drawing of the structural <br />components of the wind energy conversion system and support structures, <br />including base and footings shall be provided along with engineering date and <br />calculations to demonstrate compliance with the structural design provisions <br />of the State Building Code. Drawings and engineering calculations shall be <br />certified by a registered engineer. <br />k. Compliance with National Electrical Code. WECS electrical equipment and <br />connection shall be designed and installed in adherence to the National <br />Electrical Code. <br />If a WECS is not maintained in operational conditions and poses a potential <br />safety hazard the owner shall take expeditious action to correct the situation. <br />Subd. 5. Submittal Requirements. <br />a. Site Plan Drawing. All applications for a WECS Conditional Use Permit shall <br />1. Lot lines and dimensions. <br />2. <br />and guy wire anchors. <br />3. Location and height of all adjacent buildings, structures and <br />aboveground utilities and trees located within three hundred fifty (350) <br />feet of the exterior boundaries of the property in question. <br />4. An elevation drawing of the premises accurately depicting the <br />proposed WECS and its relationship to structures on the subject site <br />and adjacent lots. <br />
The URL can be used to link to this page
Your browser does not support the video tag.