My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2013/10/14
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2013
>
Agenda Packets - 2013/10/14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:35 PM
Creation date
2/27/2018 2:25:13 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/14/2013
Supplemental fields
City Council Document Type
City Council Packets
Date
10/14/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />Mounds View City Council September 23, 2013 <br />Regular Meeting Page 8 <br />Ramsey County for Traffic Control Signals at Intersection of CSAH 10 and <br />Silver Lake Road. <br />Public Works Director DeBar stated in 2009 the City identified the intersection of CSAH 10 and <br />Silver Lake Road to have improvements completed. He noted a highway safety improvement <br />grant was applied for and received by the City due to the high cost to benefit ratio for the <br />proposed improvements at this intersection. He explained only one leg of the intersection would <br />be the City's expense, while 100% of the emergency vehicle preemption system would be the <br />responsibility of the City. The cost for the City's portion of this project including design and <br />construction engineering would be $42,748.91. Staff requested the Council approve the <br />cooperative and maintenance agreements with Ramsey County for the traffic control signs at <br />County Road and Silver Lake Road. <br />Council Member Gunn asked if these roads would be realigned with the proposed project. She <br />questioned what color the signal poles would be. Public Works Director DeBar commented the <br />road realignment was completed with Area A of the Street Improvement Project. It was noted <br />the poles would be painted brown. <br />Mayor Flaherty asked if MSA funds could be used for this project. Public Works Director DeBar <br />stated MSA funds could be used for 100% of the City's expense for the one leg (Red Oak Drive) <br />of this intersection. <br />Mayor Flaherty was in favor of using MSA funds for this project. Finance Director Beer <br />commented this may take time and noted the City did have TIF funds available for this expense <br />as well. <br />MOTION/SECOND: Hull/Mueller. To Waive the Reading and Adopt Resolution 8157, <br />Approving Cooperative and Maintenance Agreements with Ramsey County for Traffic Control <br />Signals at Intersection of CSAH 10 and Silver Lake Road. <br />Ayes — 5 Nays — 0 Motion carried. <br />G. Resolution 8158, Authorizing Inspec, Inc. to Perform Final Design Services <br />and Prepare Bidding Documents for Reroofing and Masonry Renovation of <br />Ground Reservoir, Booster Station, and Well House No. 2. <br />Public Works Director DeBar discussed the proposed improvements for the Ground Reservoir, <br />Booster Station and Well House No. 2, which included reroofing and masonry work. The <br />proposed roofing project was described in detail with the Council. He indicated the plans would <br />be completed in 2013 while the project would be completed in 2014. It was noted Inspec had <br />completed preliminary engineering for the proposed project. Staff recommended the Council <br />authorize Inspec to perform the final design services and prepare bidding documents for the <br />proposed reroofing project. <br />Council Member Mueller asked if the expenditure for this project was moved into the 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.