Laserfiche WebLink
Service size over 4 inches $150 plus $5 surcharge <br />$150 plus $5 surcharge <br />Inspection Fees <br />No charge during normal business hours, otherwise <br />1 hour at Call -out Rate per visit <br />Re -inspection Fees <br />1 hour at Call -out Rate per visit <br />Miscellaneous Fees and Material Costs: <br />Manual Water Meter Read Fee <br />1 Hour at Call -Out Rate <br />Hydrant Meter Deposit <br />$2,500 <br />Hydrant Meter Rental (one week minimum) <br />$50/week; $150/month <br />Water Shut-off/Turn-on Fee (Repairs) <br />No charge during normal business hours, otherwise <br />1 hour at Call -Out rate per visit <br />Water Shut-off/Turn-on Fee (Snowbirds) <br />$25 per shut-off/turn-on <br />Water Meter Testing Fee <br />1 Hour at Call -Out Rate (fee waived if meter is faulty) <br />Water Testing Fee <br />1 Hour at Call -Out Rate <br />Water Meter - Residential <br />City cost plus 10% administration fee <br />Radio Remote Reading Device <br />City cost plus 10% administration fee <br />Shut -Offs and Curb Stop, Valve Boxes, Covers <br />City cost plus 10% administration fee <br />MUNICIPAL SANITARY SEWER SYSTEM FEES (Chapter 907 <br />Sewer Service Availability Charge (SAC) <br />$2,485 per Metropolitan Council <br />Environmental Services <br />Sewer Rates and Surcharges: <br />Sewer Usage Rate <br />$2-.61 12.77per 1,000 gallons water sold <br />Sewer Service Charge - Residential <br />$32.80 $34.76per Residential Equivalent Unit <br />(REU) Connection Quarterly <br />Sewer Service Charge — Commercial, Industrial, <br />Public Bldgs., & Churches <br />$89.55$85.38 per REU Connection Quarterly <br />Sewer Connection/Repair Permit Fees:* <br />Service Conn./Repair Permit Fee <br />$100 plus $5 surcharge <br />Unit Charge — New Connection <br />$150 per connection <br />Inspection Fees <br />No charge if during normal business hours, otherwise <br />1 hour at Call -out Rate per visit <br />Re -inspection Fees <br />1 hour at Call -out Rate per visit <br />*Right -of -Way Permit needed if excavation occurs in public Rights -of -Way <br />SURFACE WATER MANAGEMENT UTILITY FEES (Chapter 908) <br />Surface Water Management Utility Charges - New Construction: <br />R-1 $212 per lot <br />R-2 $1,038 per acre <br />R-3, R-4, R-0 $1,500 per acre <br />B-1, B-2, B-3, B-4 $1,500 per acre <br />1-1, PUD $2,096 per acre <br />Surface Water Management Utility Fee Rates: <br />R-1, R-2 Single & Two Family Residential <br />$4-0-09 $11.00 per unit quarterly <br />R-3 Medium Density Residential <br />$64-67 160.14 per acre quarterly <br />R-4, R-5, RO High Density Residential Mobile <br />Homes and Residential Office <br />$64.84 $71.32 per acre quarterly <br />B-1, B-2, B-3, B-4 Neighborhood Business, <br />Limited Business, Highway Business, Regional <br />Business <br />$8493 $93.42 per acre quarterly <br />2018 Draft Fee Schedule Page 15 of 16 <br />