Laserfiche WebLink
11I <br />MOMS VIEW <br />P US L I C W OR K S <br />2401 HIGHWAY 10 • MOUNDS VIEW, MN 55112 <br />(763) 717-4050 • FAX (763) 717-4019 <br />www.ei.mounds-view.mn.us/publicworks <br />IMPORTANT NOTICE <br />PUBLIC INFORMATION MEETING FOR ARDAN AVENUE STREET DESIGN <br />Your property is located on a street that the City of Mounds View plans to reconstruct next summer as part of the 2014 <br />Street and Utility Improvement Project — Area G. The City is currently in the design phase of the project and would like <br />your input on the street configuration of Ardan Avenue. <br />The City invites you to attend a short presentation by engineering staff at the next Streets and Utilities Committee <br />meeting to learn more about the street design options and allow the public an opportunity to ask questions and provide <br />any feedback, input, or suggestions. The meeting details are as follows: <br />ARDAN AVENUE DESIGN PRESENTATION <br />7:00 P.M. — MONDAY, OCTOBER 21, 2013 <br />MOUNDS VIEW CITY HALL — 2401 CO. HIGHWAY 10 <br />Background/Purpose: The street width and lane configuration for Ardan Avenue is being evaluated because it is <br />considered a non-standard street according to the City's Street and Utility Improvement Program. Ardan Avenue is also <br />being considered for pedestrian and bicycle accommodations in accordance with the City's Comprehensive Plan. After <br />the presentation and public input, the Streets and Utilities Committee is expected to make a recommendation which will <br />be forwarded to the City Council for their consideration, along with the recommendation of engineering staff. <br />Design Considerations: Ardan Avenue will be fully reconstructed with a new asphalt pavement section and vertical <br />concrete barrier curbs. City engineering staff has provided design options for street width, lane configuration, and <br />pedestrian/bicycle accommodations. Due to low traffic counts and infrequent use of on -street parking, a parking lane is <br />being recommended on the south side only (no on -street parking on north side). Recommended options for <br />pedestrian/bicycle accommodations include either: 1) a multi -use trail, or 2) a sidewalk/bike lane combination. The trail <br />and sidewalk/bike lane combination are proposed to be on the north side of the street (westbound shoulder). Typical <br />sections for these options are enclosed with this notice. <br />Feedback: Please indicate your preference for pedestrian/bicycle accommodations and parking options: <br />1. Do you support a multi -use trail for pedestrian/bicycle accommodations (circle one)? Yes No <br />2. Do you support a combination concrete sidewalk with bike lane (circle one)? Yes No <br />3. Which pedestrian/bicycle option do you prefer (circle one)? Multi -use Trail Sidewalk/Bike Lane Don't Care <br />4. What side of the street do you prefer to have parking (circle one)? North South <br />5. Name: <br />7 <br />6. Phone: <br />Ea!_�PiF <br />9. Comments: <br />Please bring this completed form to the meeting for submittal (after the presentation). If you are unable to attend the <br />meeting, you may submit it by the following methods (before 4:30 pm, Oct. 14): <br />• Drop it off at the Public Works Counter at City Hall <br />• Fax to Public Works at (763) 717-4019 <br />• E-mail feedback to nick.debar ci.mounds-view.mn.us <br />For additional information, please contact Public Works at (763) 717-4050. Thank you. <br />