My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2017/11/27
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2017
>
Agenda Packets - 2017/11/27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:18 PM
Creation date
2/27/2018 2:27:20 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/27/2017
Supplemental fields
City Council Document Type
City Council Packets
Date
11/27/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Perform stabilized full depth reclamation to a depth of 6 inches asphalt/aggregate <br />base; <br />Place 3 inches of bituminous wearing course in 2 lifts (Mix SPWEA330C). <br />Place 2 inches of bituminous base course in 2 lifts (Mix SPWEB230B). <br />It is expected that there will be some sections of curb and gutter that will require <br />replacement or correction, however, the majority of curb and gutter is expected to remain <br />undisturbed. <br />Minor storm sewer improvements may occur to allow for curb and gutter to be added to <br />the existing storm water utility system. <br />Further Discussion: <br />Funding/Chapter 429 Process <br />Improvements for the Business Park North Street Reconstruction have been discussed <br />for several years and have been included on the Capital Improvement Program and to <br />be assessed in accordance with Chapter 202 of the Municipal Code. <br />The 2018 draft budget includes $1,001,000 in 485-4470-7050 for the necessary street <br />reconstruction in Business Park North. <br />Public Hearing: <br />A Public Hearing is scheduled tonight November 27, 2017 at 6:00pm for Business Park <br />North Street Reconstruction (Program Ave, Quincy St, Woodale Dr, Clifton Dr.) with the <br />estimated total project cost of $1,001,000 <br />Respectfully submitted, <br />Don Peterson <br />Public Works Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.