My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2017/11/27
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2017
>
Agenda Packets - 2017/11/27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:18 PM
Creation date
2/27/2018 2:27:20 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/27/2017
Supplemental fields
City Council Document Type
City Council Packets
Date
11/27/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Investigation Fee <br />Equivalent to permit fee (when work commences without <br />an approvedpermit) <br />Manufactured Homes See Chapter 1110 <br />See Appendix A <br />Renewable Energy System Solar,geothermal, Wind <br />100 <br />EnerqV Conversion — Residential <br />Building Permit — Renewable Energy System (Solar, <br />See Appendix A <br />geothermal, Wind Energy Conversion) — Commercial <br />Building Permit — Billboards/Billboard Alterations <br />(includes footings) <br />$250 per billboard <br />Telecommunication Antennas <br />Repairs/Alterations/Swapping of Adding Antennas to <br />750 plus engineering/inspection fees if located on City - <br />owned property (see Public Works for more information . <br />$250 per permit <br />Existing System (City or Private Property) <br />Electrical Permits -- Same as established by the Minnesota State Board of Electricity. <br />Electrical Permits State Inspector Fees <br />Fire Permits <br />Fire (All Fire permits unless noted otherwise) <br />Fire Works Display Fireworks Sales <br />Temporary Tent <br />Tank Installation (fuel, oil gas, etc.) Tank <br />Removal (fuel oil gas, etc.) Operational Permits <br />100 <br />100 <br />$350 (business selling only fireworks) <br />$100 (business selling fireworks & other retail) <br />50 <br />$100 per tank (no surcharge) <br />$50 per tank (no surcharge) <br />$50 (annually) <br />Sprinkler Systems (Fire Suppression) <br />See Appendix A <br />Sprinkler Plan Check Fee <br />65% of permit fee (for new construction or 20 heads or <br />more only) <br />Plumbing Permits (State Surcharge Required — See Appendix B) <br />Plumbing Permits - Residential <br />Minimum $60 or 1.25% of Valuation, whichever is larger <br />Plumbing Permits - Commercial <br />Fees shall be based according to the 2017 State Statute <br />326B.153 and are determined by the City's Building <br />Official <br />Mechanical Permits (State Surcharge Required — See Appendix B) <br />Mechanical Permits - Residential <br />Minimum $60 or 2% of Valuation, whichever is larger <br />Mechanical Permits - Commercial <br />Fees shall be based according to the 2017 State Statute <br />3268.153 and are determined by the City's Building <br />Official <br />Zoning Permits (NO SURCHARGE) <br />Deck 30" and under, or not attached to dwelling <br />30 <br />2018 Draft Fee Schedule Page 5 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.