Laserfiche WebLink
Investigation Fee <br />Equivalent to permit fee (when work commences without <br />an approvedpermit) <br />Manufactured Homes See Chapter 1110 <br />See Appendix A <br />Renewable Energy System Solar,geothermal, Wind <br />100 <br />EnerqV Conversion — Residential <br />Building Permit — Renewable Energy System (Solar, <br />See Appendix A <br />geothermal, Wind Energy Conversion) — Commercial <br />Building Permit — Billboards/Billboard Alterations <br />(includes footings) <br />$250 per billboard <br />Telecommunication Antennas <br />Repairs/Alterations/Swapping of Adding Antennas to <br />750 plus engineering/inspection fees if located on City - <br />owned property (see Public Works for more information . <br />$250 per permit <br />Existing System (City or Private Property) <br />Electrical Permits -- Same as established by the Minnesota State Board of Electricity. <br />Electrical Permits State Inspector Fees <br />Fire Permits <br />Fire (All Fire permits unless noted otherwise) <br />Fire Works Display Fireworks Sales <br />Temporary Tent <br />Tank Installation (fuel, oil gas, etc.) Tank <br />Removal (fuel oil gas, etc.) Operational Permits <br />100 <br />100 <br />$350 (business selling only fireworks) <br />$100 (business selling fireworks & other retail) <br />50 <br />$100 per tank (no surcharge) <br />$50 per tank (no surcharge) <br />$50 (annually) <br />Sprinkler Systems (Fire Suppression) <br />See Appendix A <br />Sprinkler Plan Check Fee <br />65% of permit fee (for new construction or 20 heads or <br />more only) <br />Plumbing Permits (State Surcharge Required — See Appendix B) <br />Plumbing Permits - Residential <br />Minimum $60 or 1.25% of Valuation, whichever is larger <br />Plumbing Permits - Commercial <br />Fees shall be based according to the 2017 State Statute <br />326B.153 and are determined by the City's Building <br />Official <br />Mechanical Permits (State Surcharge Required — See Appendix B) <br />Mechanical Permits - Residential <br />Minimum $60 or 2% of Valuation, whichever is larger <br />Mechanical Permits - Commercial <br />Fees shall be based according to the 2017 State Statute <br />3268.153 and are determined by the City's Building <br />Official <br />Zoning Permits (NO SURCHARGE) <br />Deck 30" and under, or not attached to dwelling <br />30 <br />2018 Draft Fee Schedule Page 5 of 16 <br />