My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 8922
MoundsView
>
City Council
>
City Council
>
Resolutions
>
08500 - 08999 (2016-2018)
>
Resolution 8922
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 10:08:28 AM
Creation date
3/14/2018 9:58:48 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 8922 <br />CITY OF MOUNDS VIEW <br />COUNTY OF RAMSEY <br />STATE OF MINNESOTA <br />ACCEPTING WORK FOR THE 2016, 2017 STREET AND UTILITY IMPROVEMENT <br />PROJECT - AREA I, AND AUTHORIZING FINAL PAYMENT TO <br />DOUGLAS-KERR UNDERGROUND LLC. <br />WHEREAS, the City Council adopted Resolution 7176 on October 22, 2007 <br />establishing the Street and Utility Improvement Program (Program), which includes nine <br />Street and Utility Improvement Projects identified as Areas A through I; and, <br />WHEREAS, the City Council authorized Bolton and Menk, Inc. to perform <br />engineering design services on August 24, 2015 (Res. 8449) for Area I of the Program, <br />known as 2016 Street and Utility Improvement Project — Area I (Project); and <br />WHEREAS, the City Council approved a non-standard street design and parking <br />restrictions for Area I Street Project on November 23, 2015 (Res. 8482); and <br />WHEREAS, the City Council denied Stormwater Infiltration Program appeals and <br />approved the proposed locations of stormwater infiltration basins for the Project on <br />November 23, 2015 (Res. 8483); and <br />WHEREAS, the City Council approved bidding documents and authorized the <br />advertisement for bids for the Project on February 8, 2016 (Res. 8514); and <br />WHEREAS, a bid opening was conducted on March 15, 2016 and six sealed bids <br />were received ranging from $4,080,913.79 to $5,203,689.10 for construction of the <br />Project, <br />with the lowest responsive bid submitted by Douglas -Kerr Underground LLC, of Mora, <br />Minnesota; and <br />WHEREAS, the City Council awarded a contract for $4,080,913.79 to Douglas— <br />Kerr Underground LLC on March 28, 2016 for construction of the Project (Res. 8531); <br />and <br />WHEREAS, Douglas -Kerr Underground LLC, has successfully completed all <br />project construction and met all other contract requirements for the Project with the <br />substantial completion date of September 14, 2017 and a final construction cost of <br />$4,167,595.23; and <br />WHEREAS, City Staff and its engineering consultant, Bolton and Menk, <br />recommend accepting the completed construction work and issuing final payment for <br />$351,928.38 to Douglas -Kerr Underground LLC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.