My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013 Planning Commission Packets
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
2010-2019
>
2013
>
2013 Planning Commission Packets
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 11:49:31 AM
Creation date
3/27/2018 11:14:16 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
532
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1120.04 1120.04 (Rev. 5/10) <br />(5) The architectural design of the project is compatible with the surrounding area. <br />(6) The drainage and utility system plans are submitted to and subject to the approval of the <br />Director of Public Works/City Engineer. <br />(7) The development schedule insures a logical development of the site which will protect the <br />public interest and conserve land. <br />(8) The development is in compliance with the requirements of Chapter 1010 and Titles 1200 <br />and 1300 of this Code. <br />(9) Dwelling unit and accessory use requirements are in compliance with the district provisions <br />in which the development is planned. <br />Subd. 4. Final Plan: <br />a. Purpose: The final plan is to serve as a complete, thorough and permanent public record of the PUD <br />and the manner in which it is to be developed. It shall incorporate all prior approved plans and all <br />approved modifications thereof resulting from the PUD process. It shall serve in conjunction with <br />other City ordinances as the land use regulation applicable to the PUD. <br />b. Submission of the Final Plan: Upon approval of the development stage plan, the applicant shall file <br />with the City Administrator a final plan consisting of the information and submissions required by <br />subdivision 1120.05(3), Final Plan Stage, of this Chapter for the entire PUD or for one (1) or more <br />stages. The final plan is intended only to add detail to and to put in final form the information <br />contained in the general concept plan and the development stage plan and shall conform to the <br />development stage plan in all respects. (Amended, Ord. 844, 5-20-10) <br />c. Review of Final Plan: The Director of Public Works/City Engineer shall review the final plans to <br />assure their compliance with the general concept and development stage plans and shall require <br />appropriate revisions by the applicant wherever they do not so comply. The Director of Public <br />Works/City Engineer shall report the findings to the City Administrator who shall notify the applicant, <br />in writing, of approval of the final plan. (Amended, Ord. 844, 5-20-10) <br />d. Recording of Final Plan: Within ten (10) days of the City Administrator's notice of approval, the <br />applicant shall cause the final plan, or such portions thereof as are appropriate, to be recorded with the <br />County Register of Deeds or Register of Tifles. (Amended, Ord. 844, 5-20-10) <br />c. Ern'If ding and Other Permits: Upc o receiving notice from the Cii�r Administrator that the apprn <br />i plan has been rerordect i, m:an appropriate appl:ca ,, � he applicant, bmId:n:g o ter <br />peri-_ts may be issued to the api,licant for developrncnt, cons4n>ction and other work in the area <br />encompassed by the approved finalplan; provided, hot ;ever, fl_<iro such permit shalt b- issued ui, less <br />the requirements of all applicable codes and ordinances have been satisfied. (Amended, Ord. 84,4, 5- <br />20-10) <br />
The URL can be used to link to this page
Your browser does not support the video tag.