My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010 Planning Commission Packets
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
2010-2019
>
2010
>
2010 Planning Commission Packets
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 3:35:19 PM
Creation date
5/22/2018 3:25:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COVENTRY SENIOR LIVING <br />IVA <br />Moundsview, Minnesota <br />Grading Plan <br />\� s� <br />�r >V <br />Folz, Freeman, Erickson, Inc. <br />LAND PLANNING • SURVEYING • ENGINEERING <br />12445 55TH STREET NORTH <br />® rro T LAKE ELMON MINNESOTA 55042 <br />Phone (651) 439.8833 Fn(651)430,9331 <br />N <br />FY—+—E <br />S <br />M NAL SCAI£ <br />I CH = M NEST <br />0 15 M He <br />S. IN FEET <br />LEGEND <br />NOTES <br />1) BACKGROUND INFORMATION FROM RAMSEY COUNWAERWL MORDANT CONTOURS. <br />ADDITIONAL UTILITY INFORMATION FROM ASBUILTS BY THE CRY OF MOUNDS VIEW. FEE, <br />INC. OFFERS NO GDARANTEE AS TO THE ACCURACY OF INFORMATION PROVIDED BY <br />OTHERS. <br />2) SPOT ELEVATIONS ARE ALL GUTTER LINE ELEVATIONS UNLESS NOTED OTHERWISE. <br />3) ELEVATION&CONTOURS SHOWN AS FINISHED GRABS ELEVATIONS. <br />4) PRIOR TO ROUGH GRADING, INSTALL SILT STOP FENCE IN LOCATIONS SHOWN OR AS <br />DIRECTED BY THE ENGINEER OR CRY STAFF. <br />5) PROVIDE 4 OF NATIVE TOPSOIL IN GREEN AREAS. <br />8) SLOPES 3:1 AND GREATER SHALL BE STABILIZED WITH FIBER BLANKET. <br />T) MAINTAIN AND REPAIR SILT STOP FENCES OCCLUDING REMOVAL OF ACCUMULATED SILT) <br />UNTIL VEGETATION IS ESTABLISHED. <br />8) CONTRACTOR TO INSPECT AND DOCUMENT EROSION CONTROL DAILY AND AFTER ANY <br />RAINEVENT. <br />B) 51 LT FENCE FOUND DAMAGED MUST BE REPAIREDOR REPLACED WAN24HOURSUPON <br />DISCOVERY. REMOVAL CF SILT FENCE REQUIRED AFTER SITE IS STABILIZED (AT <br />DEFORM OF ENGINEER). <br />IN ALL EXISTING CITY STREETS SHALL BE SWEPT AS NEEDED AND AS REQUESTED BY <br />ENGINEER. <br />11) REFER TO GEOTECHNICAL REPORT FOR ADDITIONAL REQUIREMENTS. <br />12) AFTER GOADING OPERATIONS ARE COMPLETED, LANDSCAPE CONTRACTOR SHALL <br />UNCOMPACT ALL GREEN AREAS PRIOR TO BUDDING AND -AbIM APING. <br />Rev. 7-7-10 <br />✓MT.�Ml11MDR VIEW MMNFCl1T4 _nMF]C ]11111 CVCCT'I NTFI CGFFTC <br />PROPERTY BOUNDARY <br />- - - - -''- - - - - <br />EXISTING CONTOUR <br />sro <br />PROPOSED CONTOUR <br />PROPOSED RETAINING WALL <br />PROPOSED STORM SEWER WI M.H., <br />C.B. & F.E.S. <br />ORAIWIGEARROW <br />----------- <br />PROPOSEDSILTEENCE <br />® ® <br />INFRASNS INLETPROTECTKINOR <br />EQUAL <br />• ° <br />PROPOSED SPOT ELEVATION <br />� J <br />PROPOSES 12-HLTREQ( SOCK <br />NOTES <br />1) BACKGROUND INFORMATION FROM RAMSEY COUNWAERWL MORDANT CONTOURS. <br />ADDITIONAL UTILITY INFORMATION FROM ASBUILTS BY THE CRY OF MOUNDS VIEW. FEE, <br />INC. OFFERS NO GDARANTEE AS TO THE ACCURACY OF INFORMATION PROVIDED BY <br />OTHERS. <br />2) SPOT ELEVATIONS ARE ALL GUTTER LINE ELEVATIONS UNLESS NOTED OTHERWISE. <br />3) ELEVATION&CONTOURS SHOWN AS FINISHED GRABS ELEVATIONS. <br />4) PRIOR TO ROUGH GRADING, INSTALL SILT STOP FENCE IN LOCATIONS SHOWN OR AS <br />DIRECTED BY THE ENGINEER OR CRY STAFF. <br />5) PROVIDE 4 OF NATIVE TOPSOIL IN GREEN AREAS. <br />8) SLOPES 3:1 AND GREATER SHALL BE STABILIZED WITH FIBER BLANKET. <br />T) MAINTAIN AND REPAIR SILT STOP FENCES OCCLUDING REMOVAL OF ACCUMULATED SILT) <br />UNTIL VEGETATION IS ESTABLISHED. <br />8) CONTRACTOR TO INSPECT AND DOCUMENT EROSION CONTROL DAILY AND AFTER ANY <br />RAINEVENT. <br />B) 51 LT FENCE FOUND DAMAGED MUST BE REPAIREDOR REPLACED WAN24HOURSUPON <br />DISCOVERY. REMOVAL CF SILT FENCE REQUIRED AFTER SITE IS STABILIZED (AT <br />DEFORM OF ENGINEER). <br />IN ALL EXISTING CITY STREETS SHALL BE SWEPT AS NEEDED AND AS REQUESTED BY <br />ENGINEER. <br />11) REFER TO GEOTECHNICAL REPORT FOR ADDITIONAL REQUIREMENTS. <br />12) AFTER GOADING OPERATIONS ARE COMPLETED, LANDSCAPE CONTRACTOR SHALL <br />UNCOMPACT ALL GREEN AREAS PRIOR TO BUDDING AND -AbIM APING. <br />Rev. 7-7-10 <br />✓MT.�Ml11MDR VIEW MMNFCl1T4 _nMF]C ]11111 CVCCT'I NTFI CGFFTC <br />
The URL can be used to link to this page
Your browser does not support the video tag.