Laserfiche WebLink
City of Mounds View Staff Report <br />July 22, 1999 <br />Page 2 <br />8" Sanitary Sewer Main Lining <br />$36.00 per foot for total width <br />$18.00 per foot for'/2 street width ( one side ) <br />$1,440.00 improvement cost for typical 80' lot <br />In light of time schedule for any future improvements and the relatively reasonable expenses <br />associated with any combination of the street rehab methods and sanitary sewer lining, staff <br />would suggest that these type of improvements be assessed at rate of 100 % residential. When <br />the residents wish to have curb and gutter installed, the City might contribute to the costs of the <br />curb and gutter. In an MSA project, the residents could be assessed for the maximum rehab <br />method, together with any utility improvement that might take place. <br />If any of these strategies would be included in future street projects, they should be identified <br />perhaps by resolution, identified by the City Code, which would enable the expense of the <br />methods to be adjusted annually for inflation. <br />Staff seeks Council discussion and direction in these matters. <br />c el Ulrich, irector of Public Works <br />