Laserfiche WebLink
Subd. 3. with City Projects: Registrants who join in a scheduled Obstractiori or excavation <br />performed by the Director, whether or not it is a joint application by two or more <br />Registrants or a single application, are not required to pay the Excavation or Obstruction <br />and Degradation portions of the permit fee, but a permit would still be meeived <br />910.14: SUPPLEMENTARY APPLICATIONS: <br />Subd. 1. Limitation on Area: A Right -of -Way Permit is valid only for the area of the Right -of - <br />Way specified in the permit. No Permittee may do any work outside the area specified in <br />the permit, except as provided herein. Any Permittee which determine,; that an area <br />greater than that specified in the permit must be Obstructed or Excavated must before <br />working in that greater area (i) make application for a permit extension and pay any <br />additional fees required thereby, and (ii) be granted a new permit or permit extension. <br />Subd 2. Limitation on dates: A Right -of -Way Permit is valid only for the dz.tes specified in the <br />permit. No Permittee may begin its work before the permit start date or, except as <br />provided herein, continue working after the end date. If a Permittee does not finish the <br />work by the permit End date, it must apply for a new permit for the additional time it <br />needs, and receive the new permit or an extension of the old permit before working after <br />the end date of the previous permit. this Supplementary Application must be submitted <br />before the permit end date. <br />910.15, OTHER OBLIGATIONS: <br />Subd. 1. Compliance With Other Laws: Obtaining a Right -of -Way Permit does not relieve <br />Permittee of its duty to obtain all other necessary permits. licenses. and authority and to <br />pay all fees required by the City or other applicable rule, law or regulation. A Permittee <br />shall comply with all requirements of local. state and federal laws, including Minn. Stat. <br />§ 216D.01-.09 (One Call Excavation Notice System). A Permittee shall perform all work <br />in conformance with Al applicable codes and established rules and regulations. and is <br />responsible for all work done in the Right -of -Way pursuant to its permit. regardless of <br />who does the work. <br />Subd. 2. prohibited Work: Except in an Emergency, e04 gr with the approval of the Director. <br />no Right -of --way Obstruction or excavation may be done when seasonally prohibited or <br />when conditions are unreasonable for such work. <br />Subd. 3. Interference with Right -of -Way: A Permittee shall clot so Obstruct a Right -of -Way <br />that the natural free and clear passage of water through the gutters or other waterways <br />shall be interfered with. private vehicles of those doing work in the ltigbt-of-Nay may <br />not be parked within or next to a permit area, unless parked its conformance with ri the <br />,, <br />parking regulations. The loading or unloading of trucks must be donsolel <br />defined permit area unless specifically authorized by the permit. <br />910.16: DENIAL OF PERMIT: The Director may deny a permit for failure to meet the <br />requirements and conditions of this Chapter or if the Director determines that the denial is <br />,qSR-163942 1d <br />MU2to-la <br />1e9-1 rZ/91'd M-1 MORE+ N3049 ! d03NNB-Woad ZZ:9l se-8Z-10 <br />