My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1999/08/02
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1999
>
Agenda Packets - 1999/08/02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:19 PM
Creation date
6/12/2018 9:56:01 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
8/2/1999
Supplemental fields
City Council Document Type
City Council Packets
Date
8/2/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(1) The costs and benefits to the public of requiring the <br />undergtounding of all Facilities in the right-of-way <br />(2) The feasibility and cost of undergrounding all Facilities by a date <br />certain as determined by the city and the affected utilities. <br />{3} The tariff requirements, procedure and rate design for recovery or <br />intended recovery of incremental costs for undergrounding by the. utilities from <br />ratepayers within the city. <br />(4) Alternative financing options available if the city deems it in the <br />public interest to require undergtounding by a date certain and deems it <br />appropriate to participate in the cost otherwise borne by the ratepayers. <br />Upon completion of the hearing or hearings, the city council must make written <br />findings on whether it is in the public interest to establish a plan under which all Facilities <br />will be underground, either citywide or within districts designated by the city. <br />Undergroutnding PI". if the council finds that it is in the public interest to underground <br />all or substantially all ]Facilities in the public right of way, the cost itiririust establishlilde at least�a <br />plan for such undergrounding. The plan for undergrounding m <br />following elements: <br />(1) Timetable for the undergrounding. <br />(2) Designation of districts for the undergrounding unless, <br />undergrounding plan is citywide. <br />(3) Exceptions to the undergrounding requirement and procedure for <br />establishing Such exceptions. <br />(4) procedures for the undergrounding process, including but not <br />limited to coordination with city projects and provisions to endure compliance <br />with non-discrimination requirements under the law. <br />(5) A financing plan for funding of the incremental costs if the city <br />determines that it will finance some of the undergrounding costs, and a <br />determination and Verification of the claimed additional costs to underground <br />incurred by the utility. <br />({) Penalties or other remedies for failure to cnmply with the <br />undergrounding. <br />SM-164 29 <br />MU210-14 <br />189-4 tZ/W d 918-1 91E81EE+ HAYND Z AHNO-WO11 lZ:91 88-BZ-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.