My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-1999 EDA
MoundsView
>
Commissions
>
Economic Development Authority
>
Agenda Packets
>
1990-1999
>
1999
>
06-28-1999 EDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 9:15:44 AM
Creation date
6/12/2018 10:40:10 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
Economic Development Authority
Commission Doc Type
Agenda Packets
MEETINGDATE
6/28/2018
Commission Doc Number (Ord & Res)
0
Supplemental fields
Date
6/28/2018
EDA Document Type
Council Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFT <br />City of Mounds View <br />Housing Replacement Program <br />Authority will have the right to re enter and take possession of the property. The <br />Authority at its option may declare a termination in favor of the Authority rev rt the <br />title and that the title and all ri hts and interests of the Develo er shall revert to the <br />Authority. <br />J. Dation 2• Funding of Demolition <br />1. Blight Qualification: Properties being considered for demolition funding must meet blight <br />qualifications as outlined in Section G. and Section I.1. <br />2. Need for Variances: If a variance is required to redevelop the property, the homeowner <br />must obtain the variance prior to the award of demolition funds. If a variance is not granted, <br />demolition funds shall not be awarded. <br />3. Comprehensive Plan/Zoning: The Comprehensive Plan designation and the zoning on the <br />property must allow for its redevelopment by construction of a replacement single family <br />residence. <br />4. Development Agreement: The interested participant must enter into a Development <br />Agreement with the EDA which will stipulate housing design and site development criteria <br />and time frame for completion. The development agreement will include estimate of new <br />taxes generated based on the construction of replacement cost. <br />5. Demolition Contract: The interested participant must obtain three estimates for demolition <br />which will assist in determining the amount of demolition funds to award for the project. The <br />chosen demolition contractor must be able to meet project deadlines as outline by Program <br />Staff. The demolition contractor will be required to obtain all necessary City permits and pay <br />applicable fees. Overall demolition supervision will be provided by a designated Program <br />Staff in conjunction with the interested participant. <br />Economic Development Authority <br />IM <br />Dan Caughlin, President <br />By: <br />Charles S. Whiting, Executive Director <br />Revised: June 28, 1999 <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.