My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1999/06/14
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1999
>
Agenda Packets - 1999/06/14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:32 PM
Creation date
6/13/2018 5:36:04 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
6/14/1999
Supplemental fields
City Council Document Type
City Council Packets
Date
6/14/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
06-03-99 14:27 From -KENNEDY A GRAVEN +6123379310 T-295 P.12/20 F-153 <br />910.08: PERMIT REQUIREMENT: <br />Subd. 1. Permit Required: Except as otherwise provided in this Code, no Person may Obstruct or <br />Excavate any Right -of -Way without first having obtained the appropriate Right -of -Way Permit <br />from the Director to do so. <br />(a) Excavation Permit: An Excavation Permit is required by a Registrant to Excavate that part of the <br />Right -of -Way described in such permit and to hinder free and open passage over the specified portion <br />of the Right -of -Way by placing Facilities described therein, to the extent and for the duration <br />specified therein. <br />(b) Obstruction Permit: An Obstruction Permit is required by a Registrant to hinder free and open <br />passage over the specified portion of Right -of -Way by placing Equipment described therein on the <br />Right -of -Way, to the extent and for the duration specified therein. An Obstruction Permit is not <br />required if a Person already possesses a valid Excavation Permit for the same project. <br />Subd. 2. Permit Extensions; No Person rnay Excavate or Obstruct they Right -of -Way beyond the date or <br />dates specified in the permit unless such Person (i) makes a Supplementary Application for <br />another Right -of -Way Permit before the expiration of the initial permit, and (ii) a new permit or <br />permit extension is granted. <br />Subd. 3. Delay Penalty: In accordance with Minnesota Rule 7819.1000 subp. 3 and notwithstanding <br />subd. 2 of this section, the City shall establish and impose a Delay Penalty for unreasonable delays <br />in Right -of -Way excavation, Obstruction, Patching, or Restoration. The Delay Penalty shall be <br />established from time to time by City Council resolution. <br />Subd. 4. Permit Display: Permits issued under this Chapter shall be conspicuously displayed or otherwise <br />available at all times at the indicated work site and shall be available for inspection by the <br />Director. <br />910.09. PERMIT APPLICATIONS: Application for a permit is made to the Director. Right -of - <br />Way Permit applications shall contain, and will be considered complete only upon compliance with the <br />requirements of the following provisions: <br />(a) Registration with the Director pursuant to this Chapter; <br />(b) Submission of at completed permit application form, including all required attachments, and <br />scaled drawings showing the location and area of the proposed project and the location of all known <br />existing and proposed Facilities. <br />(c) Payment of money due the City for <br />(1) permit fees, estimated Restoration Costs and other Management Costs, <br />(2) prior Obstructions or Excavations; <br />(3) any undisputed loss, damage, or expense suffered by the City because of Applicant's prior <br />excavations or Obstructions of the rights-of-way or any Emergency actions taken by the City; <br />SAW63902 <br />MU21a13 y <br />
The URL can be used to link to this page
Your browser does not support the video tag.